Data Center Directory

Data centers in United States

1428 data centers in United States, 118 of them AI data centers with chip data. Largest operators by site count: Amazon Web Services (121), Meta (82), Google (77), Digital Realty (59), Microsoft (50), Flexential (39), Quality Technology Services (35), CyrusOne (33).

Data centerOperatorCityStatusPowerChips
Microsoft Fairwater WisconsinMicrosoftMount PleasantOperational, expanding442 MW
→ 2.7 GW
B200
OpenAI Stargate New MexicoOracleCanutilloUnder construction
→ 2.5 GW
NVIDIA GPUs (some AMD Instinct) (guess)
Anthropic-Amazon New CarlisleAmazon Web ServicesNew CarlisleOperational, expanding1.2 GW
→ 2.3 GW
Trainium2
Meta HyperionMetaHolly RidgeUnder construction
→ 2.2 GW
NVIDIA GPUs (some Meta MTIA) (guess)
Colossus 2SpaceXAIMemphisOperational, expanding1.3 GW
→ 2.1 GW
B200, B300
OpenAI Stargate ShackelfordOracleShackelford CountyUnder construction
→ 2.0 GW
NVIDIA GPUs (some AMD Instinct) (guess)
QTS Cedar RapidsMetaFairfaxUnder construction
→ 1.6 GW
B300
OpenAI Stargate MichiganOracleSalineUnder construction
→ 1.4 GW
NVIDIA GPUs (some AMD Instinct) (guess)
Meta PrometheusMetaNew AlbanyOperational, expanding612 MW
→ 1.3 GW
B300
OpenAI Stargate WisconsinOraclePort WashingtonUnder construction
→ 1.3 GW
NVIDIA GPUs (some AMD Instinct) (guess)
GoodnightGoogleClaudeUnder construction
→ 1.3 GW
B300
OpenAI Stargate MilamSoftbankCameronUnder construction
→ 1.2 GW
NVIDIA GPUs (guess)
OpenAI Stargate AbileneOracleAbileneOperational1.2 GWB200, B300
Google Fort WayneGoogleFort WayneUnder construction
→ 1.0 GW
Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Amazon RidgelandAmazon Web ServicesMississippiOperational, expanding273 MW
→ 1.0 GW
Trainium2
Crusoe Abilene ExpansionMicrosoftAbileneUnder construction
→ 941 MW
NVIDIA GPUs (some Microsoft Maia) (guess)
Microsoft Fairwater AtlantaMicrosoftFayettevilleOperational859 MWB200
Amazon Madison Mega SiteAmazon Web ServicesMississippi Madison CountyOperational, expanding341 MW
→ 819 MW
Trainium2
Coreweave HeliosCoreWeaveAftonOperational, expanding200 MW
→ 800 MW
B200
Meta Bowling GreenMetaBowling GreenUnder construction
→ 570 MW
B300
CoreWeave Ellendale NDCoreWeaveEllendaleOperational, expanding88 MW
→ 520 MW
B200
STACK Infrastructure NVA02STACK InfrastructureManassasOperational, expanding118 MW
→ 487 MW
H100
Google OmahaGoogleOmahaOperational, expanding284 MW
→ 474 MW
TPU v5e, TPU v5p, TPU v6e, TPU v7
Meta MontgomeryMetaMontgomeryOperational, expanding199 MW
→ 465 MW
B300
Google ColumbusGoogleColumbusOperational, expanding364 MW
→ 464 MW
TPU v5e, TPU v5p, TPU v6e, TPU v7
Google Pryor (North)GooglePryorOperational442 MWTPU v5p, TPU v5e
Anthropic Lake MarinerAI XPV PlatformBarkerOperational, expanding245 MW
→ 441 MW
TPU v7
Colossus 1SpaceXAIMemphisOperational425 MWH100, H200, B200
QTS Eagle MountainMetaEagle MountainUnder construction
→ 411 MW
B300
AWS New AlbanyAmazon Web ServicesNew AlbanyOperational, expanding255 MW
→ 405 MW
Trainium2, H100, H200, B200
Google New AlbanyGoogleNew AlbanyOperational400 MWTPU v5e, TPU v5p, TPU v6e
CoreWeave Denton TXCoreWeaveDentonOperational, expanding367 MW
→ 395 MW
B200
Google Storey CountyGoogleParadiseOperational, expanding214 MW
→ 389 MW
TPU v5e, TPU v4, TPU v6e, TPU v5p
xAI Colossus MemphisxAINew South MemphisOperational352 MWNVIDIA H100 SXM5 80GB, NVIDIA H200 SXM, NVIDIA GB200
Meta Huntsville Data CenterMetaMeridianvilleOperational344 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Google LincolnGoogleLincolnOperational, expanding170 MW
→ 339 MW
TPU v6e, TPU v7
QTS Richmond 3SandstonOperational, expanding202 MW
→ 336 MW
QTS Richmond 1Quality Technology ServicesSandstonOperational333 MW
Microsoft Fairwater Phase 2SturtevantOperational316 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
Google Cedar RapidsGoogleCedar RapidsUnder construction
→ 314 MW
Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Google Montgomery Data CenterGoogleClarksvilleOperational309 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Altoona Meta Data CenterMetaAltoonaOperational306 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Anthropic Barber LakeCipher MiningSnyderUnder construction
→ 300 MW
TPU v7
Meta El Paso Data CenterChaparralUnder construction300 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Meta Kuna Data CenterMetaKunaOperational300 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
OpenAI Stargate LordstownSoftbankWarrenUnder construction
→ 300 MW
NVIDIA GPUs (guess)
Google BristowGoogleBristowOperational286 MWTPU v5e, TPU v5p, TPU v6e, TPU v7
Google Council Bluffs (East)GoogleCouncil BluffsOperational284 MWTPU v5e, TPU v6e, TPU v5p, TPU v7
Google PapillionGooglePapillionOperational284 MWTPU v4, TPU v5e, TPU v5p
Google Lincoln Data CenterGoogleLincolnUnder construction276 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Meta Beaver Dam Data CenterMetaBeaver DamUnder construction274 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Meta Los LunasMetaLos LunasOperational, expanding147 MW
→ 273 MW
B300
Project JupiterSanta Teresa LandSunland ParkUnder construction272 MWest.
Google New Albany Data CenterGoogleNew AlbanyOperational270 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Stream PhoenixGoodyearOperational, expanding77 MW
→ 267 MW
H100
Microsoft GoodyearMicrosoftGoodyearOperational263 MWH100, B200
Microsoft Granger Data CenterGrangerOperational257 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
Apple Prineville DatacenterApplePrinevilleOperational254 MWest.
AWS Canton Data CenterAmazon Web ServicesCantonUnder construction253 MWest.AWS Trainium and NVIDIA GPUs (guess)
QTS Richmond 2SandstonOperational252 MW
Apple Reno Data CenterAppleSparksOperational250 MWest.
Meta CheyenneMetaCheyenneOperational, expanding182 MW
→ 249 MW
B300
Meta Montgomery Data CenterMontgomeryUnder construction245 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Meta-QTS Hillsboro 2MetaHillsboroOperational243 MWH100
Microsoft Boydton Data CenterMicrosoftHendersonOperational243 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
Meta JeffersonvilleMetaJeffersonvilleOperational241 MWB300
Meta RosemountMetaRosemountOperational241 MWB200
Google Omaha Data CenterGoogleOmahaOperational238 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Meta Prineville Data CenterMetaPrinevilleOperational238 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Apple Data CenterWaukeeOperational237 MWest.
Google MesaGoogleMesaOperational237 MWTPU v6e, TPU v5p
Meta Bowling Green Data CenterWatervilleUnder construction236 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Gallatin Data CenterMetaGallatinOperational235 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
CloudHQ LC4CloudHQAshburnOperational234 MW
Project Jade Data CenterCheyenneUnder construction234 MWest.
Meta TempleMetaTempleOperational231 MWB300
Microsoft Project OsmiumMicrosoftCummingOperational228 MWA100, H100, B200
Meta Cheyenne Data CenterMetaCheyenneUnder construction215 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
AWS BerwickAmazon Web ServicesBerwickOperational, expanding139 MW
→ 212 MW
Trainium2
Meta Eagle Mountain Data CenterMetaEagle MountainOperational208 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Switch - The CitadelFernleyOperational204 MWest.
The Barn Data CenterSalineUnder construction202 MWest.
Riot CorsicanaCorsicanaOperational200 MWest.
Meta HuntsvilleMetaALOperational198 MWB300
Meta KunaMetaKunaOperational198 MWB300
CoreWeave Chester VACoreWeaveVAOperational, expanding114 MW
→ 197 MW
H100, B200
Equinix InfomartEquinixDallasOperational196 MWest.
Meta data center in CovingtonMetaCovingtonOperational194 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
CloudHQ Ashburn CampusCloudHQSterlingOperational187 MW
Google Red OakGoogleRed OakOperational, expanding93 MW
→ 185 MW
TPU v6e
Google The DallesGoogleOROperational185 MWTPU v6e, TPU v5p, TPU v5e, TPU v7
CoreWeave Muskogee OKCoreWeaveMuskogeeUnder construction
→ 181 MW
B300
Vantage TX1Vantage Data CentersSan AntonioOperational, expanding45 MW
→ 179 MW
B200
Meta Eagle MountainMetaEagle MountainOperational179 MWB300
Meta Temple Data CenterMetaTempleOperational178 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Meta LCO 3 ProjectMetaNew AlbanyUnder construction174 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Meta data center in CovingtonMetaCovingtonOperational170 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Meta AikenMetaTrentonOperational168 MWB300
Google LancasterGoogleLancasterOperational164 MWTPU v5e, TPU v6e
Facebook Fort Worth DatacenterMetaRoanokeOperational163 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Meta Mesa Data CenterMetaQueen CreekOperational161 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Aligned IAD-02AlignedAshburnOperational156 MW
Cologix ASH1CologixAshburnUnder construction156 MW
Facebook Fort Worth DatacenterMetaRoanokeOperational153 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Meta Gallatin Data CenterMetaGallatinOperational152 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
AWS Ridgeland Data CenterAmazon Web ServicesRidgelandOperational151 MWest.AWS Trainium and NVIDIA GPUs (guess)
Meta Sarpy Data centerMetaChalcoOperational151 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Meta Stanton Springs Data CenterMetaSocial CircleOperational151 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Digital Realty CH1Digital RealtyElk Grove VillageOperational149 MWest.
Rowan Green Data data center in HermistonRowan Green DataHermistonOperational144 MWest.
Meta 100kMetaConcordiaOperational143 MWNVIDIA H100 SXM5 80GB, NVIDIA Tesla K40c, NVIDIA Tesla K80, NVIDIA P100, Google TPU v2, NVIDIA Tesla V100 SXM2, NVIDIA V100, Google TPU v1, NVIDIA A100, Google TPU v3, Google TPU v4, NVIDIA A100 SXM4 80 GB, Maia 100 (M100), AMD Instinct MI300X, NVIDIA H200 SXM
OpenAI/Microsoft Goodyear ArizonaMicrosoftSun LakesOperational143 MWNVIDIA H100 SXM5 80GB
CloudHQ LC12CloudHQAshburnUnder construction140 MW
CloudHQ LC14CloudHQSterlingUnder construction140 MW
CloudHQ LC8CloudHQAshburnUnder construction140 MW
Meta Kansas City Data CenterMetaSmithvilleOperational139 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
IO DatacenterEdisonOperational138 MWest.
Microsoft Granger Data CenterGrangerOperational138 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
CyrusOne NVA5CyrusOneSterlingOperational137 MW
Meta Aiken Data CenterMetaAikenUnder construction133 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Microsoft CYS DatacenterMicrosoftCheyenneOperational131 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
Sarpy Meta Data CenterChalcoOperational128 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
DFW2-DC1 ProjectWilmerUnder construction126 MWest.
Edged Chicago ORD01-02EdgedAuroraOperational126 MWest.
Google Kansas City EastGoogleKansas CityOperational126 MWNVIDIA H200 SXM
xAI ColossusxAIMemphisOperational126 MWest.NVIDIA GPUs (guess)
Digital Realty IAD39Digital RealtyAshburnOperational125 MW
Vantage VA2Vantage Data CentersSterlingOperational125 MW
CoreWeave Lancaster Greenfield siteCoreWeavePAUnder construction
→ 124 MW
NVIDIA GPUs (AMD possible) (guess)
Google MidlothianGoogleMidlothianOperational123 MWTPU v7, TPU v6e
Microsoft Fairwater AI DatacenterSturtevantOperational123 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
NTT VA10NTT Global Data CentersGainesvilleOperational122 MWest.
NAO 1/NAO 2MetaNew AlbanyOperational120 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Meta New Albany Data CenterMetaNew AlbanyOperational119 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Amazon AWS Data CenterSouth BendOperational118 MWest.AWS Trainium and NVIDIA GPUs (guess)
Data center in Pine Lake ParkPine Lake ParkOperational115 MWest.
DeKalb Meta Data CenterMetaDeKalbOperational115 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Switch "The Keep" Data Centre CampusSwitchLithia SpringsOperational115 MWest.
Meta GallatinMetaGallatinOperational114 MWB300
Google Papillion Data CenterGoogleChalcoOperational113 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Google Lockbourne, OHGoogleGrove CityOperational111 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Microsoft Goodyear Airpark CampusGoodyearOperational111 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
Facebook Altoona Data Center 3MetaAltoonaOperational109 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Meta Huntsville Data centerMetaMeridianvilleOperational106 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Microsoft SAT40MicrosoftSan AntonioOperational106 MWH100, B300
Patmos Hosting data center in Kansas CityPatmos HostingKansas CityOperational106 MWest.
Digital Realty IAD51Digital RealtyManassasOperational105 MW
Meta SarpyMetaSpringfieldOperational105 MWB300
Microsoft Fairwater AI Phase 2SturtevantUnder construction105 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
Digital Realty IAD44Digital RealtySterlingOperational104 MW
Facebook Altoona Data Center 4MetaAltoonaOperational102 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Meta Gallatin Data CenterMetaGallatinOperational98 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Meta Gallatin Data CenterMetaGallatinOperational98 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Project Ranier AWS Data CenterSouth BendOperational97 MWest.AWS Trainium and NVIDIA GPUs (guess)
QTS Piscataway Data CenterQuality Technology ServicesPiscatawayOperational96 MWest.
Aligned IAD-03AlignedSterlingOperational94 MW
EdgeCore AS01EdgeCoreSterlingOperational94 MW
Microsoft Bison Business Park Data CenterMicrosoftCheyenneOperational94 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
Project SkywayGoogleByronOperational94 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Google ArcolaGoogleSterlingOperational93 MWTPU v6e, TPU v7
Meta data center in CovingtonMetaCovingtonOperational92 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
CoreWeave Marble NCCoreWeaveMarbleOperational91 MWB200
Digital Realty IAD41Digital RealtyAshburnOperational91 MW
Google Jackson County Data CenterGoogleScottsboroOperational90 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Microsoft San AntonioMicrosoftSan AntonioOperational90 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
Facebook Fort Worth DatacenterMetaRoanokeOperational88 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Meta Rosemount Data CenterMetaRosemountUnder construction88 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
NAO 5/NAO 6MetaNew AlbanyOperational88 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Apple - Maiden Data CenterNewtonOperational87 MWest.
MetaMetaLos LunasOperational87 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
MetaMetaLos LunasOperational87 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Microsoft Texas Research Park CampusMicrosoftLackland Air Force BaseOperational87 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
MetaMetaEagle MountainOperational86 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
MetaMetaEagle MountainOperational86 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
MetaMetaPrinevilleOperational86 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
MetaMetaPrinevilleOperational86 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
QTS Richmond 2 Data CenterQuality Technology ServicesSandstonUnder construction86 MWest.
Terminal Commerce BuildingPhiladelphiaOperational85 MWest.
Compass Datacenters Goodyear CampusGoodyearOperational84 MWest.
Google Berkeley County Data CenterGoogleGoose CreekOperational82 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
H5 Data CenterClevelandOperational81 MWest.
Microsoft Goodyear CampusLitchfield ParkOperational81 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
True North Data CentersTrue North Data SolutionsBroadlandsOperational81 MWest.
Meta Sarpy Data centerMetaChalcoOperational79 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Aligned IAD-01AlignedAshburnOperational78 MW
AWS Umatilla Data CenterAmazon Web ServicesUmatillaOperational78 MWest.AWS Trainium and NVIDIA GPUs (guess)
Google data center in MooresvilleGoogleMooresvilleUnder construction78 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Lakeside Technology CenterDigital RealtyChicagoOperational78 MWest.
Amazon Web ServicesAmazon Web ServicesAshburnOperational77 MWAWS Trainium and NVIDIA GPUs (guess)
Data center in Apache JunctionApache JunctionOperational77 MWest.
Data center in Apache JunctionApache JunctionOperational77 MWest.
Digital Realty New Jersey EWR10Digital RealtyWeehawkenOperational76 MWest.
Equinix Chicago CH3EquinixElk Grove VillageOperational76 MWest.
Google Data CenterGoogleGilbertOperational76 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
QTS Richmond 3 Data CenterQuality Technology ServicesSandstonUnder construction76 MWest.
Project OsmiumMicrosoftWest Des MoinesOperational75 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
GoogleGoogleGoose CreekOperational74 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
MicrosoftMicrosoftLeon ValleyOperational74 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
Project Ginger WestMicrosoftWest Des MoinesOperational72 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
Quality Technology Services data center in SterlingQuality Technology ServicesSterlingOperational72 MW
Tesla CortexTeslaHornsby BendOperational71 MWNVIDIA H100 SXM5 80GB
Amazon IAD-100Amazon Web ServicesManassasOperational71 MWest.AWS Trainium and NVIDIA GPUs (guess)
Data center in BerwickBerwickOperational71 MWest.
MetaMetaForest CityOperational71 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
DRT LAX10Los AngelesOperational70 MWest.
MetaMetaLos LunasOperational70 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
MetaMetaLos LunasOperational70 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Microsoft-Nebius New JerseyNebiusNew JerseyOperational70 MWB300
QTS Atlanta Data Center 1Quality Technology ServicesAtlantaOperational70 MWest.
Sabey Ashburn Building ASabey Data CentersAshburnOperational70 MW
Facebook Altoona Data Center 5MetaAltoonaOperational69 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
MetaMetaAltoonaOperational69 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
MetaMetaAltoonaOperational69 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Meta data center in DeKalbMetaDeKalbOperational69 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
NAP of the AmericasMiamiOperational69 MWest.
Amazon IAD-141Amazon Web ServicesSterlingOperational68 MWest.AWS Trainium and NVIDIA GPUs (guess)
Apple Waukee Data CenterAppleWaukeeOperational68 MWest.
DouglasvilleMicrosoftLithia SpringsOperational68 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
Equinix DC17EquinixAshburnOperational67 MWest.
Project Ginger EastMicrosoftWest Des MoinesOperational67 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
Microsoft SAT14MicrosoftSan AntonioOperational66 MWH100, B300
Amazon IAD-85Amazon Web ServicesManassasOperational65 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon IAD-95Amazon Web ServicesManassasOperational65 MWest.AWS Trainium and NVIDIA GPUs (guess)
Digital Realty IAD43Digital RealtySterlingOperational65 MW
Douglasville 2FlexentialDouglasvilleOperational65 MWest.
Equinix New York Secaucus NY2EquinixSecaucusOperational64 MWest.
Meta Forest City Data CenterMetaForest CityOperational64 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Amazon IAD-150Amazon Web ServicesChantillyOperational63 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web ServicesAmazon Web ServicesDublinOperational63 MWest.AWS Trainium and NVIDIA GPUs (guess)
Data center in LancasterLancasterUnder construction63 MWest.
Amazon IAD-105Amazon Web ServicesManassasOperational62 MWest.AWS Trainium and NVIDIA GPUs (guess)
Data center in TempleTempleOperational62 MWest.
Digital Realty IAD42Digital RealtySterlingOperational62 MW
Google Mango Farm Building 3GoogleBristowOperational62 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Menlo Digital MD-VA1Oak HillOperational62 MW
STACK NVA05BSTACK InfrastructureManassasOperational62 MW
STACK NVA06STACK InfrastructureLeesburgOperational62 MW
Amazon IAD-114Amazon Web ServicesAshburnOperational61 MWAWS Trainium and NVIDIA GPUs (guess)
AWSAmazon Web ServicesManassasOperational61 MWest.AWS Trainium and NVIDIA GPUs (guess)
Google Arcola Building 3GoogleSterlingOperational61 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
MetaMetaPrinevilleOperational61 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Argonne NL AuroraUS Department of EnergyDarienOperational60 MWNVIDIA A100, Intel Data Center GPU Max 1550
Barclays DatacenterBarclaysMiddlesexOperational60 MWest.
Digital Realty Silicon Valley SC1Digital RealtySanta ClaraOperational60 MWest.
Equinix DC21EquinixAshburnOperational60 MWest.
GoogleGoogleHillsboroughOperational60 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Google Mango FarmGoogleLinton HallOperational60 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Google Mango Farm Building 1GoogleBristowOperational60 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Yondr Allegro SouthYondrBrambletonOperational60 MWest.
Meta Huntsville Data centerMetaMeridianvilleOperational59 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Riot RockdaleRockdaleOperational59 MWest.
Amazon Web ServicesAmazon Web ServicesDublinOperational58 MWest.AWS Trainium and NVIDIA GPUs (guess)
Core42 Lake MarinerCore42BarkerOperational58 MWB200
Cortex supercomputerHornsby BendOperational58 MWest.
Data center in NewtonNewtonOperational58 MWest.
CloudHQ MCC2CloudHQManassasOperational57 MWest.
CyrusOne NVA1/NVA2/NVA3CyrusOneSterlingOperational57 MW
DC5Quality Technology ServicesSandstonOperational57 MWest.
QTSQuality Technology ServicesFayettevilleOperational57 MWest.
EdgeConneX PHX02 Data CenterEdgeConneXMesaOperational56 MWest.
Project AlluvionMicrosoftWest Des MoinesOperational56 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
Sarpy Meta Data CenterMetaChalcoOperational56 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Compass PHX IIYoungtownUnder construction55 MWest.
EdgeCore AS02EdgeCoreSterlingOperational55 MW
H5 AshburnH5 Data CentersAshburnOperational55 MW
QTS Ashburn-ShellhornQuality Technology ServicesSterlingOperational55 MW
Switch Las Vegas 15SwitchEnterpriseOperational55 MWest.
Tahoe Reno 1SwitchMcCarranOperational55 MWest.
CloudHQ MCC1CloudHQManassasOperational54 MWest.
Douglasville 1FlexentialDouglasvilleOperational54 MWest.
Hurricane Electric Fremont 2Hurricane ElectricFremontOperational54 MWest.
PowerHouse CTP-03HopewellUnder construction54 MWest.
RIC3 DC5Quality Technology ServicesSandstonUnder construction54 MWest.
Argo Data CenterPostUnder construction53 MWest.
Data center in NewtonNewtonOperational53 MWest.
Data center in Pine Lake ParkPine Lake ParkOperational53 MWest.
GoogleGoogleMidlothianOperational53 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Amazon Web ServicesAmazon Web ServicesDublinOperational52 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web ServicesAmazon Web ServicesDublinOperational52 MWest.AWS Trainium and NVIDIA GPUs (guess)
DataBank IAD3DataBankAshburnOperational52 MW
MetaMetaPrinevilleOperational52 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Sarpy Meta Data CenterMetaChalcoOperational52 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Amazon Web Services data center in Lithia SpringsAmazon Web ServicesLithia SpringsUnder construction51 MWest.AWS Trainium and NVIDIA GPUs (guess)
Cyxtera Dallas-Fort Worth Data CenterCyxteraEulessOperational51 MWest.
STACK NVA02ESTACK InfrastructureManassasOperational51 MWest.
Aligned Data CentersAligned Data CentersLithia SpringsOperational50 MWest.
Amazon New Albany: Jug and Beach RoadAmazon Web ServicesNew AlbanyOperational50 MWest.AWS Trainium and NVIDIA GPUs (guess)
QTS Phoenix 2 CampusPhoenixOperational50 MWest.
RIC2 DC2SandstonOperational50 MWest.
Skybox Chicago ISkyboxElk Grove VillageOperational50 MWest.
Amazon Web Services Datacenter ComplexAmazon Web ServicesSterlingOperational49 MWAWS Trainium and NVIDIA GPUs (guess)
CyrusOne data center in AuroraCyrusOneAuroraOperational49 MWest.
CyrusOne Sterling NVA9CyrusOneSterlingOperational49 MW
Facebook Altoona Data Center 1MetaAltoonaOperational49 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Google The Dalles Data CenterGoogleThe DallesOperational49 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Colossus 2xAISouthavenOperational48 MWest.NVIDIA GPUs (guess)
Data center in MeridianvilleMeridianvilleOperational48 MWest.
QTS Irving - Dallas Data Center CampusQuality Technology ServicesIrvingOperational48 MWest.
CoreSite VA3CoreSiteRestonOperational47 MWest.
CyrusOne NVA14CyrusOneAshburnOperational47 MW
Digital Realty ACC4Digital RealtyAshburnOperational47 MW
NorthMark Strategies Data CenterSpartanburgOperational47 MWest.
STACK NVA02xSTACK InfrastructureManassasOperational47 MWest.
STACK NVA05ASTACK InfrastructureManassasOperational47 MW
Stream Data Centers PHXA CampusGoodyearOperational47 MWest.
Goldman SachsBridgewater TownshipOperational46 MWest.
Live Oak Data CenterDallasOperational46 MWest.
Cherokee Data CenterTulsaOperational45 MWest.
Digital Fortress: RichmondDigital FortressHopewellOperational45 MWest.
Google Data CenterGoogleSouth RidingOperational45 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Intergate Quincy Data CenterSabey Data CentersQuincyOperational45 MWest.
One WilshireLos AngelesOperational45 MWest.
Visa Operations Center EastVisaAshburnOperational45 MWest.
AppleApplePrinevilleOperational44 MWest.
CyrusOne Cincinnati-Lebanon CampusCyrusOneLebanonOperational44 MWest.
Digital Realty ACC5Digital RealtyAshburnOperational44 MW
Digital Realty ACC7Digital RealtyAshburnOperational44 MW
LCO 1MetaNew AlbanyOperational44 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Microsoft Cheyenne Business Parkway Data CenterCheyenneOperational44 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
Vantage VA3Vantage Data CentersAshburnOperational44 MWest.
Aligned Data CentersEl MirageUnder construction43 MWest.
Centersquare Elk Grove Village Data Center Campus ORD2CentersquareElk Grove VillageOperational43 MWest.
CyrusOne data center in DurhamCyrusOneDurhamOperational43 MWest.
Cyxtera (Digital Realty Trust) Citibank Data CenterCyxteraWeehawkenOperational43 MWest.
Digital Realty Dallas DFW18Digital RealtyRichardsonOperational43 MWest.
Digital Realty New York EWR12Digital RealtyPiscataway TownshipOperational43 MWest.
Data center in Spanish SpringsSpanish SpringsOperational42 MWest.
Digital Realty data center in SterlingDigital RealtySterlingOperational42 MWest.
Data center in Apache JunctionApache JunctionOperational41 MWest.
Iron Mountain data center in SandstonIron MountainSandstonOperational41 MWest.
QTS Manassas DC5Quality Technology ServicesManassasOperational41 MWest.
Strategic DatasphereAlpharettaOperational41 MWest.
Vantage Building 3VantageNew AlbanyOperational41 MWest.
Aligned Data CenterElk Grove VillageOperational40 MWest.
Cipher Digital data center in KermitCipher DigitalKermitOperational40 MWest.NVIDIA GPUs (AMD possible) (guess)
CoreWeave Dalton 1 & 2CoreWeaveGAOperational40 MWB300
CyrusOne data center in SomersetCyrusOneSomersetOperational40 MWest.
Google Project CardinalGoogleLenoirOperational40 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Iron Mountain VA-2Iron MountainManassasOperational40 MWest.
Oak Ridge NL FrontierUS Department of EnergyOak RidgeOperational40 MWAMD Radeon Instinct MI250X
QTS ChicagoQuality Technology ServicesChicagoOperational40 MWest.
YahooYahooLa VistaOperational40 MWest.
ADP South DakotaSioux FallsOperational39 MWest.
Amazon IAD-12Amazon Web ServicesSterlingOperational39 MWAWS Trainium and NVIDIA GPUs (guess)
Compass Data CenterRed OakOperational39 MWest.
Compass Data CenterRed OakOperational39 MWest.
Compass Data CenterRed OakOperational39 MWest.
Compass Data CenterRed OakOperational39 MWest.
Compass Data CenterRed OakOperational39 MWest.
QTSQuality Technology ServicesTyroneOperational39 MWest.
Amazon IAD-144Amazon Web ServicesSterlingOperational38 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon New Albany: Innovation Campus WayAmazon Web ServicesNew AlbanyOperational38 MWest.AWS Trainium and NVIDIA GPUs (guess)
Bank of America Data CenterBank of AmericaSandstonOperational38 MWest.
Digital Realty ACC9Digital RealtyAshburnOperational38 MW
GoogleGoogleClarksvilleOperational38 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Google Datacenter - Douglas CountyGoogleMabletonOperational38 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
IONIC Digital CedarvaleIONIC DigitalPecosOperational38 MWest.
KOMO Plaza EastSeattleOperational38 MWest.
Meta data center in SandstonMetaSandstonOperational38 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
SPC4AGoogleClarksvilleOperational38 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
UHG Data CenterChaskaOperational38 MWest.
Verizon Wireless Mew BuildingSouthlakeOperational38 MWest.
Amazon IAD-55Amazon Web ServicesHaymarketOperational37 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon IAD-89Amazon Web ServicesSterlingOperational37 MWest.AWS Trainium and NVIDIA GPUs (guess)
MicrosoftMicrosoftSan AntonioOperational37 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
QTS Data CenterQuality Technology ServicesRoanokeOperational37 MWest.
Sentinel Cloud PlazaGI PartnersSterlingOperational37 MWest.
Tahoe Reno 5SwitchMcCarranOperational37 MWest.
The KeepSwitchLithia SpringsOperational37 MWest.
Amazon IAD-92Amazon Web ServicesSterlingOperational36 MWest.AWS Trainium and NVIDIA GPUs (guess)
Apple Mesa Data CenterAppleApache JunctionOperational36 MWest.
Centersquare Atlanta ATL1CentersquareLithia SpringsOperational36 MWest.
Data center in HilliardHilliardOperational36 MWest.
Equinix SV5EquinixSan JoseOperational36 MWest.
Microsoft East Point Datacenter CampusMicrosoftUnion CityOperational36 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
The KeepSwitchLithia SpringsOperational36 MWest.
Amazon IAD-103Amazon Web ServicesManassasOperational35 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon IAD-74Amazon Web ServicesManassasOperational35 MWest.AWS Trainium and NVIDIA GPUs (guess)
Data center in GoodyearGoodyearOperational35 MWest.
Digital Realty ACC10Digital RealtyAshburnOperational35 MW
Lawrence Livermore NL El CapitanUS Department of EnergyLivermoreOperational35 MWNVIDIA V100, AMD Instinct MI300A
MetaMetaEagle MountainOperational35 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Walmart Colorado Data CenterWalmartAir Force AcademyOperational35 MWest.
42254 THUNDERBALL DRTrue North Data SolutionsLeesburgOperational34 MWest.
Digital Loudoun PlazaDigital RealtyBroadlandsOperational34 MW
Iron Mountain VA-6Iron MountainManassasOperational34 MWest.
Meta Henrico Data CenterMetaSandstonOperational34 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
QTS SuwaneeQuality Technology ServicesSuwaneeOperational34 MWest.
Secure Data CenterAlpharettaOperational34 MWest.
Arcola Tech ParkMicrosoftBrambletonOperational33 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
Data center in HendersonHendersonOperational33 MWest.
Data center in KunaKunaOperational33 MWest.
DXC Technology data center in CypressDXC TechnologyCypressOperational33 MWest.
DXC Technology data center in Prairie ViewDXC TechnologyPrairie ViewOperational33 MWest.
eBayHerrimanOperational33 MWest.
Google Leesburg Building 3LeesburgOperational33 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Iron Mountain VA-7Iron MountainBull RunOperational33 MWest.
NTT PH1 DatacenterNTT Global Data CentersMesaOperational33 MWest.
Switch12SwitchEnterpriseOperational33 MWest.
Tahoe Reno 3SwitchMcCarranOperational33 MWest.
Amazon AWS: Hilliard Data CenterAmazon Web ServicesHilliardOperational32 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon IAD-61Amazon Web ServicesChantillyOperational32 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web ServicesAmazon Web ServicesDublinOperational32 MWest.AWS Trainium and NVIDIA GPUs (guess)
Centersquare Lisle ORD4 Data CenterCentersquareLisleOperational32 MWest.
CyrusOne CHI9CyrusOneAuroraOperational32 MWest.
Data center in DelawareDelawareOperational32 MWest.
Data center in OrangeburgOrangeburgOperational32 MWest.
Data center in San JoseSan JoseOperational32 MWest.
Data center in SomersetSomersetOperational32 MWest.
DC BLOX data center in Lithia SpringsDC BLOXLithia SpringsUnder construction32 MWest.
Digital Realty New York HVN10Digital RealtyTrumbullOperational32 MWest.
Digital Realty Phoenix PHX15Digital RealtyChandlerOperational32 MWest.
USPO Terminal AnnexUnited States Postal ServiceLos AngelesOperational32 MWest.
Amazon Web ServicesAmazon Web ServicesBoardmanOperational31 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web ServicesAmazon Web ServicesBoardmanOperational31 MWest.AWS Trainium and NVIDIA GPUs (guess)
Bloomberg Data CenterBloombergOrangeburgOperational31 MWest.
CyrusOne NVA8CyrusOneSterlingOperational31 MW
Data center in AuroraAuroraOperational31 MWest.
Digital Realty IAD53Digital RealtyManassasOperational31 MW
Flexential Portland - Hillsboro 3FlexentialHillsboroOperational31 MWest.
GoogleGoogleBellevueOperational31 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
GoogleGoogleLancasterOperational31 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
GoogleGoogleLancasterOperational31 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Google NBY-4GoogleNew AlbanyOperational31 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Google NBY-5GoogleNew AlbanyOperational31 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Google NBY-6GoogleNew AlbanyOperational31 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Intergate ColumbiaSabey Data CentersEast Wenatchee BenchOperational31 MWest.
MARA Data CenterMarathon DigitalGranburyOperational31 MWest.
MicrosoftMicrosoftLackland Air Force BaseOperational31 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
Microsoft Leesburg Building 1MicrosoftLeesburgOperational31 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
QTSQuality Technology ServicesFayettevilleOperational31 MWest.
QTSQuality Technology ServicesFayettevilleOperational31 MWest.
T5 Data Centers data center in Lithia SpringsT5 Data CentersLithia SpringsUnder construction31 MWest.
Core Scientific Pecos TX Data CenterPecosOperational30 MWest.NVIDIA GPUs (AMD possible) (guess)
Data center in CheyenneCheyenneOperational30 MWest.
Digital Realty Atlanta ATL11Digital RealtyAustellOperational30 MWest.
Digital Realty CH2Digital RealtyElk Grove VillageOperational30 MWest.
JPMorgan Chase data center in TotowaJPMorgan ChaseTotowaOperational30 MWest.
Microsoft Columbia Data CenterQuincyOperational30 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
NTT RagingWire DC - HillsboroNTT Global Data CentersHillsboroOperational30 MWest.
Sabey Ashburn Building BSabey Data CentersAshburnOperational30 MW
The Seattle TimesH5 Data CentersSeattleOperational30 MWest.
Vantage OH1 Data Center CampusVantageNew AlbanyOperational30 MWest.
Amazon IAD-668Amazon Web ServicesLeesburgOperational29 MWest.AWS Trainium and NVIDIA GPUs (guess)
Applied Digital / Ellendale Data CenterApplied DigitalAberdeenOperational29 MWest.NVIDIA GPUs (AMD possible) (guess)
Equinix New York Secaucus NY5EquinixSecaucusOperational29 MWest.
Google NBY-7GoogleNew AlbanyOperational29 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
JPMorgan ChaseJPMorgan ChaseBroomfieldOperational29 MWest.
MetaMetaPrinevilleOperational29 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
NTTData Data CenterNTT Global Data CentersQuincyOperational29 MWest.
Serverfarm CH1ServerfarmChicagoOperational29 MWest.
Switch Las Vegas 7SwitchEnterpriseOperational29 MWest.
Switch Las Vegas 9SwitchEnterpriseOperational29 MWest.
Amazon IAD-119Amazon Web ServicesSterlingOperational28 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon IAD-174Amazon Web ServicesDullesOperational28 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon IAD-500Amazon Web ServicesHerndonOperational28 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web ServicesAmazon Web ServicesHilliardOperational28 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web ServicesAmazon Web ServicesHilliardOperational28 MWest.AWS Trainium and NVIDIA GPUs (guess)
Cologix Jacksonville JAX1JacksonvilleOperational28 MWest.
Data center in ManassasManassasOperational28 MWest.
GoogleGoogleHillsboroughOperational28 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Lonestar Dream -Tarbush SiteFort StocktonOperational28 MWest.
Microsoft - Azure DatacenterMicrosoftNorthlakeOperational28 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
STACK Chicago CHI01STACK InfrastructureElk Grove VillageOperational28 MWest.
Stack Infrastructure - POR02STACK InfrastructureHillsboroOperational28 MWest.
Amazon IAD-143Amazon Web ServicesSterlingOperational27 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon IAD-161Amazon Web ServicesAshburnOperational27 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon IAD-197Amazon Web ServicesGainesvilleOperational27 MWest.AWS Trainium and NVIDIA GPUs (guess)
Credit Suisse: Clifton Data CenterNutleyOperational27 MWest.
CyrusOne Chandler CampusCyrusOneChandlerOperational27 MWest.
Data center in KunaKunaOperational27 MWest.
Data center in ParkvilleParkvilleOperational27 MWest.
Data center in SturtevantSturtevantOperational27 MWest.
Data center in TempleTempleOperational27 MWest.
Data Foundry - Texas 1AustinOperational27 MWest.
Digital Realty PDX11 Data CenterDigital RealtyHillsboroOperational27 MWest.
Digital Realty PDX11 Data CenterDigital RealtyHillsboroOperational27 MWest.
Equinix DC10EquinixAshburnOperational27 MWest.
Flexential Dallas - PlanoFlexentialPlanoOperational27 MWest.
Gainesville Crossing Data Center CampusCorscale Data CentersGainesvilleUnder construction27 MWest.
GoogleGoogleBellevueOperational27 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
GoogleGoogleRed OakOperational27 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
GoogleGoogleBellevueOperational27 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Google NBY-1GoogleNew AlbanyOperational27 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
MetaMetaEagle MountainOperational27 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Quality Technology Services data center in New AlbanyQuality Technology ServicesNew AlbanyUnder construction27 MWest.
Stack Infrastructure PHX02 CampusPhoenixUnder construction27 MWest.
Stream Data Centers DFWAStream Data CentersGarlandOperational27 MWest.
Switch: The RockSwitchRound RockOperational27 MWest.
Tech Park at BrambletonBlackChamberBrambletonOperational27 MWest.
Vantage Quincy CampusVantageQuincyOperational27 MWest.
Amazon IAD-132Amazon Web ServicesManassasOperational26 MWest.AWS Trainium and NVIDIA GPUs (guess)
AppleAppleWaukeeOperational26 MWest.
Data center in Deer ValleyDeer ValleyOperational26 MWest.
Data center in MeridianvilleMeridianvilleOperational26 MWest.
Data center in SmithvilleSmithvilleOperational26 MWest.
Data center in SmithvilleSmithvilleOperational26 MWest.
Digital Realty Chicago ORD12Digital RealtyFranklin ParkOperational26 MWest.
Digital Realty IAD37Digital RealtyAshburnOperational26 MW
Digital Realty IAD55Digital RealtySterlingOperational26 MW
GoogleGoogleBellevueOperational26 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
GoogleGoogleGrove CityOperational26 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
MicrosoftMicrosoftSanta ClaraOperational26 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
MicrosoftMicrosoftSan AntonioOperational26 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
Microsoft Leesburg Building 4LeesburgOperational26 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
Stack Infrastructure PHX01 CampusGoodyearUnder construction26 MWest.
Switch Las Vegas 8SwitchEnterpriseOperational26 MWest.
Tahoe Reno 2SwitchMcCarranOperational26 MWest.
U.S. Bank National Data Process CenterOlatheOperational26 MWest.
Amazon Web ServicesAmazon Web ServicesHilliardOperational25 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web ServicesAmazon Web ServicesBoardmanOperational25 MWest.AWS Trainium and NVIDIA GPUs (guess)
AWSAmazon Web ServicesManassasUnder construction25 MWest.AWS Trainium and NVIDIA GPUs (guess)
Data center in AtlantaAtlantaOperational25 MWest.
Data center in Brentwood EstatesBrentwood EstatesOperational25 MWest.
Data center in CheyenneCheyenneOperational25 MWest.
Data center in HendersonHendersonOperational25 MWest.
Equinix CU2EquinixCulpeperOperational25 MWest.
GoogleGoogleChalcoOperational25 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
GoogleGoogleChalcoOperational25 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
GoogleGoogleChalcoOperational25 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Intergate Seattle East Building 3Sabey Data CentersTukwilaOperational25 MWest.
QTSQuality Technology ServicesAuroraOperational25 MWest.
Yahoo Data CenterYahooQuincyOperational25 MWest.
Amazon IAD-180Amazon Web ServicesBrambletonOperational24 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web ServicesAmazon Web ServicesUmatillaOperational24 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web ServicesAmazon Web ServicesNew AlbanyOperational24 MWest.AWS Trainium and NVIDIA GPUs (guess)
Centersquare IAD4-BCentersquareAshburnOperational24 MWest.
Data center in CoppellCoppellOperational24 MWest.
Equinix DC12EquinixAshburnOperational24 MWest.
Flexential Denver - EnglewoodFlexentialEnglewoodOperational24 MWest.
Flexential Portland - Hillsboro 2FlexentialHillsboroOperational24 MWest.
Google Council Bluffs Data CenterGoogleCouncil BluffsOperational24 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
H5 Data CenterIntuitQuincyOperational24 MWest.
xAI QTS AtlantaSpaceXAIAtlantaOperational24 MWH100, A100
Amazon AWS SAT - 12807 DonopAmazon Web ServicesSan AntonioOperational23 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon IAD-192Amazon Web ServicesSterlingOperational23 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web ServicesAmazon Web ServicesNew AlbanyOperational23 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web ServicesAmazon Web ServicesBoardmanOperational23 MWest.AWS Trainium and NVIDIA GPUs (guess)
AppleApplePrinevilleOperational23 MWest.
CenterisSouth HillOperational23 MWest.
Data center in CarteretCarteretOperational23 MWest.
Data center in SmithvilleSmithvilleOperational23 MWest.
DC BLOX Myrtle Beach Cable Landing StationMyrtle BeachOperational23 MWest.
Digital RealtyDigital RealtySachseOperational23 MWest.
Digital Realty Data CenterDigital RealtyAtlantaOperational23 MWest.
Flexential Dallas - RichardsonFlexentialRichardsonOperational23 MWest.
GoogleGoogleBellevueOperational23 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
GoogleGoogleMidlothianOperational23 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Lincoln Rackhouse MarylandLincoln RackhouseSilver SpringOperational23 MWest.
QTSQuality Technology ServicesAuroraOperational23 MWest.
VeriSign IncorporatedDullesOperational23 MWest.
Virginia Information Technologies AgencyHopewellOperational23 MWest.
Amazon Fadeley IIIAmazon Web ServicesSouth RidingOperational22 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon IAD-214Amazon Web ServicesSterlingOperational22 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon IAD-76Amazon Web ServicesSterlingOperational22 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web ServicesAmazon Web ServicesUmatillaOperational22 MWest.AWS Trainium and NVIDIA GPUs (guess)
BB&T Data CenterWendellOperational22 MWest.
CyrusOne data center in AuroraCyrusOneAuroraOperational22 MWest.
Data center in CheyenneCheyenneOperational22 MWest.
Data center in LaurelLaurelOperational22 MWest.
Data center in The WoodlandsThe WoodlandsOperational22 MWest.
EdgeConneX CHI01EdgeConneXElk Grove VillageUnder construction22 MWest.
Equinix SV10EquinixSan JoseOperational22 MWest.
Lumen Austin 1AustinOperational22 MWest.
Mapletree IndustrialAlpharettaOperational22 MWest.
Microsoft EAT02MicrosoftEast Wenatchee BenchOperational22 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
STACK NVA01ASTACK InfrastructureSterlingOperational22 MW
Microsoft GPT-4 clusterMicrosoftDes MoinesOperational21 MWNVIDIA A100
Amazon IAD-131Amazon Web ServicesManassasOperational21 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon IAD-135Amazon Web ServicesChantillyOperational21 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon IAD-15Amazon Web ServicesSterlingOperational21 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon IAD-193Linton HallOperational21 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web ServicesAmazon Web ServicesHermistonOperational21 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web Services data center in South RidingAmazon Web ServicesSouth RidingOperational21 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web Services Datacenter ComplexAmazon Web ServicesNew AlbanyOperational21 MWest.AWS Trainium and NVIDIA GPUs (guess)
Centersquare IAD1-CCentersquareSterlingOperational21 MWest.
Centersquare NYC3 Data CenterCentersquareSecaucusOperational21 MWest.
CITIGROUP TECHNOLOGY INCRoanokeOperational21 MWest.
Data center in HendersonHendersonOperational21 MWest.
Data center in Lackland Air Force BaseLackland Air Force BaseOperational21 MWest.
Databank LGA3DatabankOrangeburgOperational21 MWest.
DataBank SLC6DataBankBluffdaleOperational21 MWest.
Flexential Portland - Hillsboro 5FlexentialHillsboroOperational21 MWest.
Google Henderson Data CenterGoogleHendersonOperational21 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Iron MountainIron MountainTempe JunctionOperational21 MWest.
MicrosoftMicrosoftWaukeeOperational21 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
MicrosoftMicrosoftNorwalkOperational21 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
Microsoft EAT04MicrosoftEast Wenatchee BenchUnder construction21 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
Microsoft SAT 81MicrosoftSan AntonioOperational21 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
NTT Ashburn CampusNTT Global Data CentersAshburnOperational21 MW
PHX-13MicrosoftGoodyearOperational21 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
STACK NVA02ASTACK InfrastructureManassasOperational21 MWest.
Vantage VA13Vantage Data CentersSterlingOperational21 MWest.
Allentown-TekParkAncient OaksOperational20 MWest.
Amazon IAD-145Amazon Web ServicesSterlingOperational20 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web ServicesAmazon Web ServicesUmatillaOperational20 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web ServicesAmazon Web ServicesHermistonOperational20 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web ServicesAmazon Web ServicesHermistonOperational20 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web ServicesAmazon Web ServicesBoardmanOperational20 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web ServicesAmazon Web ServicesHermistonOperational20 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web ServicesAmazon Web ServicesBoardmanOperational20 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web ServicesAmazon Web ServicesUmatillaOperational20 MWest.AWS Trainium and NVIDIA GPUs (guess)
AWSAmazon Web ServicesManassasUnder construction20 MWest.AWS Trainium and NVIDIA GPUs (guess)
AWS IAD111Amazon Web ServicesLinton HallUnder construction20 MWest.AWS Trainium and NVIDIA GPUs (guess)
CoreSite VA1CoreSiteRestonOperational20 MWest.
CyrusOne CIN2CyrusOneCincinnatiOperational20 MWest.
Data center in QuincyQuincyOperational20 MWest.
Digital RealtyDigital RealtyOaklandOperational20 MWest.
Digital Realty IAD30Digital RealtyChantillyOperational20 MWest.
Edged Chicago ORD01-01EdgedAuroraOperational20 MWest.
Equinix San Jose SV3EquinixSan JoseOperational20 MWest.
Google - ThorntonGoogleThortonOperational20 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Google data center in Goose CreekGoogleGoose CreekOperational20 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Google Data Center The Dalles OregonGoogleThe DallesOperational20 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Greenidge Power Plant and Data CenterGreenidge GenerationPenn YanOperational20 MWest.
Insurance Exchange BuildingFlexentialDenverOperational20 MWest.
Iron Mountain VA-5Iron MountainManassasOperational20 MWest.
MicrohardxAISouthavenUnder construction20 MWest.NVIDIA GPUs (guess)
NTTNTT Global Data CentersPlanoOperational20 MWest.
Switch Las Vegas 10EnterpriseOperational20 MWest.
UPS Data CenterAlpharettaOperational20 MWest.
Amazon IAD-128Amazon Web ServicesSterlingOperational19 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon IAD-147Amazon Web ServicesSterlingOperational19 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web ServicesAmazon Web ServicesBoardmanOperational19 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web ServicesAmazon Web ServicesUmatillaOperational19 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web ServicesAmazon Web ServicesUmatillaOperational19 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web ServicesAmazon Web ServicesBoardmanOperational19 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web ServicesAmazon Web ServicesRidgelandOperational19 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web ServicesAmazon Web ServicesBoardmanOperational19 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web ServicesAmazon Web ServicesRidgelandOperational19 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web ServicesAmazon Web ServicesBoardmanOperational19 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web ServicesAmazon Web ServicesHermistonOperational19 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web ServicesAmazon Web ServicesHermistonOperational19 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web ServicesAmazon Web ServicesHermistonOperational19 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web Services data center in UmatillaAmazon Web ServicesUmatillaOperational19 MWest.AWS Trainium and NVIDIA GPUs (guess)
COPT DC-6ManassasOperational19 MWest.
CyrusOne San Antonio IICyrusOneLeon ValleyOperational19 MWest.
Data center in CantonCantonUnder construction19 MWest.
Data center in CantonCantonUnder construction19 MWest.
Data center in CantonCantonUnder construction19 MWest.
Data center in CantonCantonUnder construction19 MWest.
Data center in CheyenneCheyenneOperational19 MWest.
Data center in QuincyQuincyOperational19 MWest.
Data center in South BendSouth BendOperational19 MWest.
Data center in South BendSouth BendOperational19 MWest.
Data center in South BendSouth BendOperational19 MWest.
Data center in South BendSouth BendOperational19 MWest.
Digital CrossroadDigital CrossroadHammondOperational19 MWest.
Digital Realty Austin AUS11AustinOperational19 MWest.
EdgeCore DigitalApache JunctionOperational19 MWest.
Evoque Allen DA1CentersquareAllenOperational19 MWest.
Flexential Phoenix - Deer ValleyFlexentialPhoenixOperational19 MWest.
Microsoft TRP3 (SAT46)MicrosoftLackland Air Force BaseOperational19 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
STACK Infrastructure data center in Lithia SpringsSTACK InfrastructureLithia SpringsUnder construction19 MWest.
Stream Chicago IIStreamElk Grove VillageOperational19 MWest.
Aligned Data Center - Chicago ORD-01AlignedNorthlakeOperational18 MWest.
Aligned Data Centers DFW-04Aligned Data CentersPlanoOperational18 MWest.
Amazon IAD-163Amazon Web ServicesDullesOperational18 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon IAD-169Amazon Web ServicesAshburnOperational18 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon IAD-99Amazon Web ServicesSterlingOperational18 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web ServicesAmazon Web ServicesDublinOperational18 MWest.AWS Trainium and NVIDIA GPUs (guess)
Centersquare IAD2-BCentersquareSterlingOperational18 MWest.
Chirisa Technology Parks - PiscatawayChirisa Technology ParksMiddlesexOperational18 MWest.
CloudHQ LC5CloudHQAshburnUnder construction18 MWest.
CloudHQ MCC6ACloudHQManassasOperational18 MWest.
Cologix Santa Clara SV1 Data CenterCologixSanta ClaraOperational18 MWest.
Core Scientific COT2 Data CenterPecosOperational18 MWest.NVIDIA GPUs (AMD possible) (guess)
CyrusOne San Antonio IVLeon ValleyOperational18 MWest.
Data center in HendersonHendersonOperational18 MWest.
Data center in HendersonHendersonOperational18 MWest.
Data center in New AlbanyNew AlbanyOperational18 MWest.
Data center in Santa ClaraSanta ClaraOperational18 MWest.
Data center in WarrentonWarrentonOperational18 MWest.
Digital Realty ACC3Digital RealtyAshburnOperational18 MW
Hewlett-PackardAlpharettaOperational18 MWest.
Kaiser Data CenterNapaOperational18 MWest.
LightEdge Austin IIAustinOperational18 MWest.
Microsoft Data Center - Hoffman EstatesHoffman EstatesOperational18 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
Microsoft SAT14ValeroLeon ValleyOperational18 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
NTT VA2NTT Global Data CentersAshburnOperational18 MW
NYSE Data CenternyseMahwahOperational18 MWest.
QTSQuality Technology ServicesPhoenixOperational18 MWest.
QTSQuality Technology ServicesPhoenixOperational18 MWest.
QTS Data Center - Hillsboro 2Quality Technology ServicesHillsboroOperational18 MWest.
RagingWire CA2NTT Global Data CentersSacramentoOperational18 MWest.
Vantage San Antonio IIVantage Data CentersLeon ValleyOperational18 MWest.
Alinged Data Center DFW-03Aligned Data CentersMansfieldOperational17 MWest.
Amazon Web ServicesAmazon Web ServicesDublinOperational17 MWest.AWS Trainium and NVIDIA GPUs (guess)
BT Radianz: 492 River RoadbtLyndhurstOperational17 MWest.
Data center in AtlantaAtlantaOperational17 MWest.
Data center in Linton HallLinton HallUnder construction17 MWest.
Digital Realty VA3Digital RealtyRestonOperational17 MW
Element Critical CH1Element CriticalWood DaleOperational17 MWest.
Equinix SV4EquinixSunnyvaleOperational17 MWest.
Evocative SecaucusEvocativeSecaucusOperational17 MWest.
Flexential Nashville - Cool SpringsFlexentialFranklinOperational17 MWest.
Google Lenoir Data CenterGoogleLenoirOperational17 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Intergate Columbia BSabey Data CentersEast WenatcheeOperational17 MWest.
Markley Data CenterMarkleyLowellOperational17 MWest.
NTTNTT Global Data CentersPlanoOperational17 MWest.
Project MountainMicrosoftWest Des MoinesOperational17 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
QTS Data Center - Hillsboro 1Quality Technology ServicesHillsboroOperational17 MWest.
Stream Data CentersStream Data CentersElk Grove VillageUnder construction17 MWest.
Travelers InsuranceTravelers InsuranceChalcoOperational17 MWest.
Vantage Data Centers AZ1 CampusVantage Data CentersGoodyearOperational17 MWest.
Amazon IAD-86Amazon Web ServicesChantillyOperational16 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web Services CMH56Amazon Web ServicesNew AlbanyOperational16 MWest.AWS Trainium and NVIDIA GPUs (guess)
Centersquare IAD1-BCentersquareSterlingOperational16 MWest.
CyrusOne Allen CampusCyrusOneAllenOperational16 MWest.
CyrusOne Cincinnati-Hamilton CIN4CyrusOneHamiltonOperational16 MWest.
CyrusOne QuincyCyrusOneQuincyOperational16 MWest.
Data center in Leon ValleyLeon ValleyOperational16 MWest.
Digital Realty Silicon Valley SJC37Digital RealtySanta ClaraOperational16 MWest.
Equinix DC13EquinixAshburnOperational16 MW
fifteenfortyseven CSR ORNY1fifteenfortyseven Critical Systems RealtyOrangeburgOperational16 MWest.
GoogleGoogleGoose CreekOperational16 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
HPCSandia National LaboratoriesAlbuquerqueOperational16 MWest.
MACROHARDRRxAISouthavenOperational16 MWest.NVIDIA GPUs (guess)
NTT VA1NTT Global Data CentersAshburnOperational16 MW
NTT VA8NTT Global Data CentersAshburnUnder construction16 MWest.
QTS Data Center - Hillsboro 2Quality Technology ServicesHillsboroOperational16 MWest.
Sentinel Ashburn - Building 1Sentinel Data CentersSterlingOperational16 MWest.
Vantage Santa Clara CA2Vantage Data CentersSanta ClaraOperational16 MWest.
NVIDIA CoreWeave Eos-DFWNvidia,CoreWeavePlanoOperational16 MWNVIDIA H100 SXM5 80GB
Amazon DCA-64Amazon Web ServicesSpringfieldOperational15 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web Services data center in GainesvilleAmazon Web ServicesGainesvilleOperational15 MWest.AWS Trainium and NVIDIA GPUs (guess)
Cisco AllenAllenOperational15 MWest.
Csquare SFO2CsquareSanta ClaraOperational15 MWest.
CyrusOne data center in Fort WorthCyrusOneFort WorthOperational15 MWest.
CyrusOne data center in TotowaCyrusOneTotowaOperational15 MWest.
CyrusOne NVA9CyrusOneSouth RidingOperational15 MWest.
Data center in SmithvilleSmithvilleOperational15 MWest.
Data center in Spanish SpringsSpanish SpringsOperational15 MWest.
Flexential Minneapolis - ChaskaFlexentialChaskaOperational15 MWest.
GoogleGoogleBellevueOperational15 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Hyperscale Data CenterDowagiacOperational15 MWest.
Iron Mountain Records StorageIron MountainPhoenixOperational15 MWest.
Lumen TechnologiesTustinOperational15 MWest.
MicrosoftMicrosoftAldieOperational15 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
Microsoft Leesburg Building 5LeesburgOperational15 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
Microsoft TRP1MicrosoftLackland Air Force BaseOperational15 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
Minnesota Gateway Data CenterMinneapolisOperational15 MWest.
NTT Chicago CH3NTT Global Data CentersItascaOperational15 MWest.
PowerHouse CTP-02PowerHouseHopewellOperational15 MWest.
PowerHouse Pacific Building 1PowerHouse Data CentersSterlingUnder construction15 MWest.
PowerHouse Pacific Building 2SterlingUnder construction15 MWest.
PSE&G Delivery Emergency Response CenterPSE&GBound BrookOperational15 MWest.
QTS Manassas DC3Quality Technology ServicesManassasOperational15 MWest.
QTS San AntonioQuality Technology ServicesLeon ValleyOperational15 MWest.
Quality Technology Data CenterQuality Technology ServicesNew AlbanyOperational15 MWest.
Spectrum Charlotte National Data CenterCharlotteOperational15 MWest.
Stonewall Creek Business ParkGoogleLeesburgOperational15 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Stream Chicago IStreamElk Grove VillageOperational15 MWest.
T5@ClevelandT5 Data CentersLakewoodOperational15 MWest.
Verizon Freehold Data CenterVerizonWest FreeholdOperational15 MWest.
White Oak Technology Park 2QTSSandstonOperational15 MWest.
Tesla 10k H100 ClusterTeslaHarper WoodsOperational15 MWNVIDIA H100 SXM5 80GB
Aligned DC - PDX-01Aligned Data CentersHillsboroOperational14 MWest.
Amazon IAD-156Amazon Web ServicesChantillyOperational14 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon IAD-9Amazon Web ServicesChantillyOperational14 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web ServicesAmazon Web ServicesBoardmanOperational14 MWest.AWS Trainium and NVIDIA GPUs (guess)
Barclays DatacenterBarclaysCranfordOperational14 MWest.
CoreSite SV2CoreSiteMilpitasOperational14 MWest.
CyrusOne data center in ChandlerCyrusOneChandlerOperational14 MWest.
CyrusOne data center in ChandlerCyrusOneChandlerOperational14 MWest.
CyrusOne data center in SterlingCyrusOneSterlingOperational14 MW
Data center in CheyenneCheyenneOperational14 MWest.
Data center in HerndonHerndonUnder construction14 MWest.
Data center in Leon ValleyLeon ValleyOperational14 MWest.
Data center in Leon ValleyLeon ValleyOperational14 MWest.
Data center in OlatheOlatheOperational14 MWest.
Data center in Santa ClaraSanta ClaraOperational14 MWest.
Digital Realty New Jersey EWR21Digital RealtyCliftonOperational14 MWest.
Digital Realty San Francisco SFO10Digital RealtySan FranciscoOperational14 MWest.
Digital Realty Silicon Valley SJC10Digital RealtySanta ClaraOperational14 MWest.
EbayHerrimanOperational14 MWest.
EdgeCore Silicon ValleySanta ClaraOperational14 MWest.
Google Taylor Lake Data CenterGoogleThe DallesOperational14 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Iron Mountain Data & Record StorageIron MountainChicagoOperational14 MWest.
OVHcloud - HillsboroOVHcloudHillsboroOperational14 MWest.
PhoenixNAPPhoenixOperational14 MWest.
PowerHouse Pacific Building 3SterlingUnder construction14 MWest.
T5 Chicago II Data CenterT5 Data CentersElk Grove VillageOperational14 MWest.
Vantage Data Centers AZ2 CampusGoodyearUnder construction14 MWest.
Westlake Data CenterVantage Data CentersMabletonUnder construction14 MWest.
Meta Research SuperCluster (RSC-1)MetaSandstonOperational13 MWNVIDIA A100
Amazon IAD-7Amazon Web ServicesManassasOperational13 MWest.AWS Trainium and NVIDIA GPUs (guess)
Atlas Powr Williston DatacenterAtlas Power Holdings (ND)WillistonOperational13 MWest.
BNY Mellon SomersetManvilleOperational13 MWest.
Cox Data CenterRoswellOperational13 MWest.
CTI BiopharmaSeattleOperational13 MWest.
CyrusOne data center in NorwalkCyrusOneNorwalkOperational13 MWest.
Data center in AllenAllenOperational13 MWest.
Data center in HendersonHendersonOperational13 MWest.
Data center in South RidingSouth RidingOperational13 MWest.
Data center in Spanish SpringsSpanish SpringsOperational13 MWest.
Data center in Spanish SpringsSpanish SpringsOperational13 MWest.
Data center in Spanish SpringsSpanish SpringsOperational13 MWest.
DataBank IAD1DataBankAshburnOperational13 MW
Digital Realty Dallas DFW29Digital RealtyRichardsonOperational13 MWest.
Digital Realty data center in TysonsDigital RealtyTysonsOperational13 MWest.
Experian McKinney Data CenterAllenOperational13 MWest.
Flexential Charlotte - SouthFlexentialCharlotteOperational13 MWest.
Flexential Philadelphia - CollegevilleFlexentialCollegevilleOperational13 MWest.
GoogleGoogleSangareeOperational13 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
GoogleGoogleScottsboroOperational13 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
IU Data CenterIndiana UniversityBloomingtonOperational13 MWest.
MicrosoftMicrosoftQuincyOperational13 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
MicrosoftMicrosoftNorwalkOperational13 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
Microsoft CHI12 Data CenterMicrosoftElk Grove VillageUnder construction13 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
QTS Ashburn LockridgeQuality Technology ServicesSterlingOperational13 MWest.
RagingWire CA3NTT Global Data CentersSacramentoOperational13 MWest.
Stack InfrastructureSTACK InfrastructureMilpitasOperational13 MWest.
Stream San Antonio IILeon ValleyOperational13 MWest.
TierPointSaint LouisOperational13 MWest.
TierPoint - Charlotte Data CenterTierPointCharlotteOperational13 MWest.
TierPoint Valley ForgeTierPointAudubonOperational13 MWest.
US Bitcoin data center in Niagara FallsUS BitcoinNiagara FallsOperational13 MWest.
VerizonOmahaOperational13 MWest.
Westin BuildingDigital RealtySeattleOperational13 MWest.
165 Halsey / Equinix NY1 / Databank EWR1TishmanNewarkOperational12 MWest.
Amazon IAD-10Amazon Web ServicesSterlingOperational12 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon IAD-167Amazon Web ServicesHerndonOperational12 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon IAD-285Amazon Web ServicesSterlingOperational12 MWest.AWS Trainium and NVIDIA GPUs (guess)
CoreSite BO1SomervilleOperational12 MWest.
CyrusOne data center in Council BluffsCyrusOneCouncil BluffsOperational12 MWest.
CyrusOne SAT10 & SAT11CyrusOneLackland Air Force BaseOperational12 MWest.
Data center in MiddlesexMiddlesexOperational12 MWest.
Data center in NewingtonNewingtonOperational12 MWest.
DataBank Las Vegas LAS1DataBankLas VegasOperational12 MWest.
DataBank Plano Data CenterDataBankPlanoOperational12 MWest.
Digital Realty Data CenterDigital RealtyTempeOperational12 MWest.
Digital Realty Silicon Valley SJC34Digital RealtySanta ClaraOperational12 MWest.
Digital Realty VA4Digital RealtyBristowOperational12 MW
Equinix NY7 Data CenterEquinixNorth BergenOperational12 MWest.
GoogleGoogleBellevueOperational12 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
H5 MinneapolisH5Saint PaulOperational12 MWest.
Intergate Seattle East Building 4Digital RealtyTukwilaOperational12 MWest.
Liquid Web, IncLansingOperational12 MWest.
Meta data center in SandstonMetaSandstonOperational12 MWest.NVIDIA GPUs (some Meta MTIA) (guess)
Pearl Plaza Office BuildingDenverOperational12 MWest.
Pittock BlockAlco PropertiesPortlandOperational12 MWest.
Segra Data CenterRaleighOperational12 MWest.
STACK SVY02STACK InfrastructureSanta ClaraOperational12 MWest.
T5 Data CenterAlpharettaOperational12 MWest.
Adobe Data CenterHillsboroOperational11 MWest.
Amazon IAD-116Amazon Web ServicesSterlingOperational11 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon IAD-51Amazon Web ServicesSterlingOperational11 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web Services data center in SterlingAmazon Web ServicesSterlingOperational11 MWest.AWS Trainium and NVIDIA GPUs (guess)
CenturyLinkCenturyLinkSalemOperational11 MWest.
CyberNAP Glen BurnieAiNETSouth GateOperational11 MWest.
CyrusOne Cincinnati-Mason CIN3CyrusOneLandenOperational11 MWest.
Data center in Ballenger CreekBallenger CreekOperational11 MWest.
Data center in Jersey VillageJersey VillageOperational11 MWest.
DataBankBrooklyn ParkOperational11 MWest.
DataBank Dallas Empire Central Data CenterDataBankDallasOperational11 MWest.
Digital Realty data center in ManvilleDigital RealtyManvilleOperational11 MWest.
EdgeConnex - DEN02EdgeConneXDove ValleyOperational11 MWest.
Element CriticalUniversity of TexasOperational11 MWest.
Equinix SE3 Data CenterEquinixSeattleOperational11 MWest.
Flexential Brentwood Data CenterFlexentialBrentwood EstatesOperational11 MWest.
Frost Bank data center in Leon ValleyFrost BankLeon ValleyOperational11 MWest.
Hurricane Electric Fremont 1Hurricane ElectricFremontOperational11 MWest.
Lightedge Data CenterChaskaOperational11 MWest.
Lowe's Data CenterLowe'sLeon ValleyOperational11 MWest.
NTT Global Data Centers data center in San JoseNTT Global Data CentersSan JoseOperational11 MWest.
Oppidan data center in HilliardOppidanHilliardOperational11 MWest.
OptimumMiddlesexOperational11 MWest.
Oxford NetworksFirstLightBrunswickOperational11 MWest.
Prime Data CentersElk Grove VillageUnder construction11 MWest.
Serverfarm - LAX1ServerfarmEl SegundoOperational11 MWest.
T5@Colorado SpringsColorado SpringsOperational11 MWest.
Telehouse TeleportTelehouseNew York CityOperational11 MWest.
TJX Corporate TechnoNew AlbanyOperational11 MWest.
Amazon IAD-11Amazon Web ServicesManassasOperational10 MWest.AWS Trainium and NVIDIA GPUs (guess)
Centersquare Lynnwood SE1CentersquareLynnwoodOperational10 MWest.
Csquare SFO1CsquareSanta ClaraOperational10 MWest.
Cyxtera Tampa TP1CyxteraTampaOperational10 MWest.
Data center in Asbury ParkAsbury ParkOperational10 MWest.
Data FoundryAldineOperational10 MWest.
Digital Realty Dallas DFW16Digital RealtyRichardsonOperational10 MWest.
DRT LAX12Digital RealtyEl SegundoOperational10 MWest.
EdgeCoreMesaOperational10 MWest.
EquinixEquinixMiddlesexOperational10 MWest.
Flexential Las Vegas - NorthFlexentialNorth Las VegasOperational10 MWest.
HostDime data center in MaitlandHostDimeMaitlandOperational10 MWest.
IBM Quantum Data CenterPoughkeepsieOperational10 MWest.
Lincoln RackhouseNapervilleOperational10 MWest.
Pewaukee Data CenterWE EnergiesWaukeshaOperational10 MWest.
Rackspace Richardson DFW3RackspaceRichardsonOperational10 MWest.
Sungard Systems InternationalBessemerOperational10 MWest.
Verizon Branchburg NEC DatacenterVerizonBridgewaterOperational10 MWest.
XO FremontXOMilpitasOperational10 MWest.
Cologix COL2CologixColumbusOperational9.9 MWest.
LexisNexus SpringfieldSpringfieldOperational9.9 MWest.
Prime DFW01-01PrimeDallasOperational9.9 MWest.
AmazonAmazon Web ServicesSanta ClaraOperational9.8 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon IAD-175Amazon Web ServicesSterlingOperational9.8 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web Services data center in Bull RunAmazon Web ServicesBull RunOperational9.8 MWest.AWS Trainium and NVIDIA GPUs (guess)
AT&T CenterAmerican Telephone & TelegraphSan DiegoOperational9.8 MWest.
Data center in MuskogeeMuskogeeOperational9.8 MWest.
Vantage data center in Santa ClaraVantageSanta ClaraOperational9.8 MWest.
Flexential Atlanta - Alpharetta Data CenterFlexentialAlpharettaOperational9.7 MWest.
Lumen McLean 1Lumen TechnologiesMcLeanOperational9.7 MWest.
OVH US East Vint HillNew BaltimoreOperational9.6 MWest.
Atlanta, GAData CanopyLithia SpringsOperational9.5 MWest.
Data center in Mint HillMint HillOperational9.5 MWest.
Equinix DC7EquinixViennaOperational9.5 MWest.
CyrusOne data center in Wappingers FallsCyrusOneWappingers FallsOperational9.4 MWest.
NTT Chicago CH4NTT Global Data CentersItascaOperational9.4 MWest.
Stack Infrastructure - POR01STACK InfrastructureHillsboroOperational9.4 MWest.
Flexential Allentown Data CenterFlexentialAllentownOperational9.3 MWest.
Intergate Seattle East Building 2TukwilaOperational9.3 MWest.
Data center in HendersonHendersonOperational9.2 MWest.
Data center in ParkvilleParkvilleOperational9.2 MWest.
DataBank - DEN5DataBankCentennialOperational9.2 MWest.
EquinixEquinixSecaucusOperational9.2 MWest.
FidelityFidelityPapillionOperational9.2 MWest.
Lumen AshburnLumen TechnologiesAshburnOperational9.2 MWest.
Cologix COL4CologixColumbusOperational9.1 MWest.
CyrusOne data center in FlorenceCyrusOneFlorenceOperational9.1 MWest.
Data center in AbileneAbileneOperational9.1 MWest.
Data center in AbileneAbileneOperational9.1 MWest.
Data center in AbileneAbileneOperational9.1 MWest.
Data center in AbileneAbileneOperational9.1 MWest.
Data Foundry Austin 1 Data CenterAustinOperational9.1 MWest.
Data center in AbileneAbileneOperational9 MWest.
Data center in AbileneAbileneOperational9 MWest.
Data center in AbileneAbileneOperational9 MWest.
Data center in AbileneAbileneOperational9 MWest.
Data center in AbileneAbileneOperational9 MWest.
Data center in AbileneAbileneOperational9 MWest.
Data center in AbileneAbileneOperational9 MWest.
Data center in AbileneAbileneOperational9 MWest.
Data center in AbileneAbileneOperational9 MWest.
Data center in AbileneAbileneOperational9 MWest.
Data center in AbileneAbileneOperational9 MWest.
Data center in AbileneAbileneOperational9 MWest.
Digital Loudoun PlazaAmazon Web ServicesBroadlandsOperational9 MWAWS Trainium and NVIDIA GPUs (guess)
Digital Realty IAD14Digital RealtyAshburnOperational9 MW
EquinixEquinixTorranceOperational9 MWest.
CHRISTUS Health data center in Leon ValleyCHRISTUS HealthLeon ValleyOperational8.9 MWest.
Digital Realty PDX10 Data CenterDigital RealtyHillsboroOperational8.9 MWest.
Aligned Data CentersAligned Data CentersSanduskyOperational8.8 MWest.
Verizon Hillsboro (Tanasbourne) Data CenterVerizon BusinessHillsboroOperational8.8 MWest.
Data center in ParkvilleParkvilleOperational8.6 MWest.
GoDaddy - GilbertGilbertOperational8.6 MWest.
QTS SacramentoQuality Technology ServicesSacramentoOperational8.6 MWest.
Stack Infrastructure - POR03STACK InfrastructureHillsboroOperational8.6 MWest.
Tennessee Processing Center LLCBNYMNashvilleOperational8.6 MWest.
Flexential Nashville - FranklinFlexentialFranklinOperational8.5 MWest.
Merrill Lynch Data CenterMerrill LynchNew SpringvilleOperational8.5 MWest.
NYGC Chateaugay2CRSiMaloneOperational8.5 MWest.
EdgeConneX - Portland POR03EdgeConneXHillsboroOperational8.4 MWest.
Encompass Minneapolis FacilityEncompassLino LakesOperational8.4 MWest.
DataBank Pittsburgh PIT2PittsburghOperational8.3 MWest.
LightEdge SAN1San DiegoOperational8.3 MWest.
TierPoint Dallas Data CenterTierPointDallasOperational8.3 MWest.
Data center in WoodburyWoodburyOperational8.2 MWest.
EdgeConneXEdgeConneXTempeOperational8.2 MWest.
Csquare SFO3CsquareSunnyvaleOperational8.1 MWest.
Equinix DC97EquinixHerndonOperational8.1 MWest.
SAP COS02SAPAir Force AcademyOperational8.1 MWest.
DBT Data - Harrisonburg CenterHarrisonburgOperational8 MWest.
Equinix DC2EquinixAshburnOperational8 MW
Involta data center in HarrisonInvoltaHarrisonOperational8 MWest.
John F. Simms BuildingSONMSanta FeOperational8 MWest.
Scott Data CenterOmahaOperational7.9 MWest.
Ascent - Atlanta Data CenterAscentAlpharettaOperational7.8 MWest.
DataBank Piscataway EWR2MiddlesexOperational7.8 MWest.
Element Critical CH2Element CriticalWood DaleOperational7.8 MWest.
Involta-AkronAkronOperational7.8 MWest.
SES - Hawley Earth StationSESCarbondaleOperational7.7 MWest.
Centersquare: Phoenix - (PHX1 - Mesa)CentersquareMesaOperational7.6 MWest.
Rackspace Belmont NYC2Bound BrookOperational7.6 MWest.
Evocative Santa Clara SJC11Santa ClaraOperational7.5 MWest.
Black Rock Financial ManagementKansas CityOperational7.4 MWest.
TierPoint Baltimore BWILinthicum HeightsOperational7.4 MWest.
Verizon - Bloomington NetworkVerizonBloomingtonOperational7.4 MWest.
365 Main Street Data CenterDigital RealtySan FranciscoOperational7.3 MWest.
Equinix Santa Clara SV2EquinixSanta ClaraOperational7.3 MWest.
Union Pacific Jack Koraleski Technology, Research & Development CenterUnion Pacific RailroadOmahaOperational7.3 MWest.
CoreSite AT2 - Marietta Data CenterCoreSiteSmyrnaOperational7.2 MWest.
Data center in Leon ValleyLeon ValleyOperational7.2 MWest.
First National Technical CenterFirst National of NebraskaOmahaOperational7.2 MWest.
Lumen Sunnyvale 1Lumen TechnologiesSunnyvaleOperational7.2 MWest.
EdgeConnex Data CenterEdgeConneXElk Grove VillageUnder construction7.1 MWest.
Quicken Loans data center in DetroitQuicken LoansDetroitOperational7.1 MWest.
Charles Schwab Data CenterRoanokeOperational7 MWest.
Equinix DC3EquinixAshburnOperational7 MW
Lumen Dallas - 3180 Irving Blvd.Lumen TechnologiesDallasOperational7 MWest.
ActapioActapioEast Wenatchee BenchOperational6.9 MWest.
Centurylink data center in El SegundoCenturylinkEl SegundoOperational6.9 MWest.
Data center in FlintFlintOperational6.9 MWest.
Epic / Mayo Data CenterRochesterOperational6.9 MWest.
Lawrence Berkeley NL NERSC PerlmutterUS Department of EnergyBerkeleyOperational6.9 MWNVIDIA A100 SXM4 40 GB, NVIDIA A100 SXM4 80 GB
STACK Infrastructure data center in HillsboroSTACK InfrastructureHillsboroUnder construction6.9 MWest.
Switch Las Vegas 16SwitchEnterpriseOperational6.9 MWest.
CoreSpace DallasCoreSpaceDallasOperational6.8 MWest.
Flexential - RichmondFlexentialRichmondOperational6.8 MWest.
Flexential Portland - Hillsboro 1FlexentialHillsboroOperational6.8 MWest.
H5 PhoenixH5ChandlerOperational6.8 MWest.
HEB data center in San AntonioHEBSan AntonioOperational6.8 MWest.
TierPoint data center in AndoverTierPointAndoverOperational6.8 MWest.
UF Research Computing CenterUniversity of FloridaGainesvilleOperational6.8 MWest.
Verizon data center in MinneapolisVerizonMinneapolisOperational6.8 MWest.
CSquare - DEN2EnglewoodOperational6.7 MWest.
Flexential Charlotte - NorthFlexentialCharlotteOperational6.7 MWest.
Oregon State Data CenterState of OregonSalemOperational6.7 MWest.
PG&E DatacenterFairfieldOperational6.7 MWest.
Vantage VA16Vantage Data CentersSterlingOperational6.7 MWest.
Carrier Services GroupBoardmanOperational6.6 MWest.
Data center in BeltsvilleBeltsvilleOperational6.6 MWest.
DLI ONEDLI ONEcolumbusOperational6.6 MWest.
HCA Information Technology & Services Data CenterLa VergneOperational6.6 MWest.
Nautilus CryptomineBerwickOperational6.6 MWest.
Azure OpenAI GPT-3 ClusterMicrosoftQuincyOperational6.6 MWNVIDIA V100
Compugen New AlbanyNew AlbanyOperational6.5 MWest.
EdgeConneX Detroit DET01EdgeConneXSouthfieldOperational6.5 MWest.
Flexential Fort LauderdaleFlexentialFort LauderdaleOperational6.5 MWest.
Lumen NorristownLumen TechnologiesAudubonOperational6.5 MWest.
Data center in NorthlakeNorthlakeOperational6.4 MWest.
Flexential Louisville - EastFlexentialLouisvilleOperational6.4 MWest.
Lightedge Des Moines 2AltoonaOperational6.4 MWest.
MasterCard data center in Dardenne PrairieMasterCardDardenne PrairieOperational6.4 MWest.
OracleHillsboroOperational6.4 MWest.NVIDIA GPUs (some AMD Instinct) (guess)
TPx Colocation DatacenterTPx CommunicationsSanta AnaOperational6.4 MWest.
University Corporation for Atmospheric Research data center in CheyenneUniversity Corporation for Atmospheric ResearchCheyenneOperational6.4 MWest.
Data center in ElkridgeElkridgeOperational6.3 MWest.
DC Blox data center in East Highland ParkDC BloxEast Highland ParkOperational6.3 MWest.
Percheron DCRowan Green DataHermistonOperational6.3 MWest.
32 Avenue of the AmericasDigital RealtyNew York CityOperational6.1 MWest.
CYS42 DatacenterMicrosoftCheyenneOperational6.1 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
Intergate Seattle West Building ASabey Data CentersTukwilaOperational6.1 MWest.
Cable & Wireless Cable Landing StationShirleyOperational6 MWest.
CyrusOne data center in AustinCyrusOneAustinOperational6 MWest.
GoogleGoogleBellevueOperational6 MWest.Google TPU (plus NVIDIA GPUs for cloud customers) (guess)
Wall Township Cable Landing StationTataBelmarOperational6 MWest.
Flexential Louisville - DowntownFlexentialLouisvilleOperational5.9 MWest.
VISAVISAVernon HillsOperational5.9 MWest.
NFDG AndromedaNat Friedman and Daniel GrossAshburnOperational5.8 MWNVIDIA H100 SXM5 80GB, NVIDIA A100 SXM4 40 GB
CoreSite Secaucus CampusCoreSiteSecaucusOperational5.8 MWest.
Data center in CheyenneCheyenneOperational5.8 MWest.
T5 Charlotte CampusKings MountainOperational5.8 MWest.
Flexential Salt Lake City - MillcreekFlexentialSalt Lake CityOperational5.7 MWest.
STACK New AlbanyNew AlbanyOperational5.7 MWest.
ExxonMobil Discovery 6ExxonMobilSpringOperational5.7 MWNVIDIA A100 SXM4 40 GB, NVIDIA GH200
DataBankDallasOperational5.6 MWest.
DataBank IAD2DataBankMcLeanOperational5.5 MWest.
Flexential Salt Lake City - DowntownFlexentialSalt Lake CityOperational5.5 MWest.
Switch Las Vegas 12EnterpriseOperational5.5 MWest.
TierPoint data center in LenexaTierPointLenexaOperational5.5 MWest.
CoreSite Chicago Data Center (CH2)CoreSiteChicagoOperational5.4 MWest.
EdgeConneX San DiegoEdgeConneXSan DiegoOperational5.4 MWest.
SV ColoSV ColoSanta ClaraOperational5.4 MWest.
Xfinity/Comcast Data CenterCentennialOperational5.4 MWest.
CoreSite SV7CoreSiteSanta ClaraOperational5.3 MWest.
Data center in GetzvilleGetzvilleOperational5.3 MWest.
Data center in Linton HallLinton HallUnder construction5.3 MWest.
LightEdge Austin IAustinOperational5.3 MWest.
Microsoft data center in CheyenneMicrosoftCheyenneOperational5.3 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
QTS Santa Clara 2Quality Technology ServicesSanta ClaraOperational5.3 MWest.
TierPoint Sioux Falls West Data CenterSioux FallsOperational5.3 MWest.
Time Warner DatacenterCentennialOperational5.3 MWest.
Aligned data center in PlanoAlignedPlanoOperational5.2 MWest.
Cogent Data CenterCogent CommunicationsPhoenixOperational5.2 MWest.
CoreSite SV9CoreSiteSanta ClaraOperational5.2 MWest.
DataBank Santa Clara SFO1DataBankSanta ClaraOperational5.1 MWest.
Amazon Web ServicesAmazon Web ServicesEulessOperational5 MWest.AWS Trainium and NVIDIA GPUs (guess)
Compass Data CenterRed OakOperational5 MWest.
Expedient Pittsburgh SouthExpedientPittsburghOperational5 MWest.
QTS Ashburn MoranQuality Technology ServicesSterlingOperational5 MW
Rice Data CenterHoustonOperational5 MWest.
33 Thomas StreetNew YorkOperational4.9 MWest.
Alpheus DataCenterAlpheusAustinOperational4.9 MWest.
Data center in AshburnAshburnOperational4.9 MWest.
Data center in PecosPecosOperational4.9 MWest.
Data center in WallingfordWallingfordOperational4.9 MWest.
Flexential Atlanta - NorcrossFlexentialNorcrossOperational4.9 MWest.
T-Mobile Everglades MSO Data CenterSunriseOperational4.9 MWest.
T5 Data Centers data center in Lithia SpringsT5 Data CentersLithia SpringsUnder construction4.9 MWest.
Voltage Park TexasVoltage ParkBrownwoodOperational4.9 MWNVIDIA A100, NVIDIA H100 SXM5 80GB, Intel Habana Gaudi2
CyrusOne CHI6CyrusOneWood DaleOperational4.8 MWest.
Verizon Wireless data center in OmahaVerizon WirelessOmahaOperational4.8 MWest.
NVIDIA SeleneNvidiaSanta ClaraOperational4.7 MWNVIDIA A100
CyrusOne data center in Leon ValleyCyrusOneLeon ValleyOperational4.7 MWest.
Data center in South RidingSouth RidingOperational4.7 MWest.
Digital Realty Silicon Valley SJC11Digital RealtySanta ClaraOperational4.7 MWest.
Dynamics MiningMadisonvilleOperational4.7 MWest.
Texas Cryptologic CenterNational Security AgencyLeon ValleyOperational4.7 MWest.
TierPoint Little RockMaumelleOperational4.7 MWest.
US Signal - OR01 BendUS SignalBendOperational4.7 MWest.
Dell 350 Holger WaySan JoseOperational4.6 MWest.
Geneseo Communications IncBettendorfOperational4.6 MWest.
MineOne Wyoming Data CenterMineOneCheyenneOperational4.6 MWest.
ScaleMatrix data center in AllenScaleMatrixAllenOperational4.6 MWest.
Verizon Wireless data center in DetroitVerizon WirelessDetroitOperational4.6 MWest.
Vultr Chicago ClusterVultrLisleOperational4.6 MWAMD Instinct MI300X
CarfaxColumbiaOperational4.5 MWest.
CenturyLink data center in Las CrucesCenturyLinkLas CrucesOperational4.5 MWest.
Middletown Data CenterMiddletownOperational4.4 MWest.
NovartisEvermanOperational4.4 MWest.
Data center in DibollDibollOperational4.3 MWest.
Equinix Chicago Data CH7EquinixWestmontOperational4.3 MWest.
Data center in HendersonHendersonOperational4.2 MWest.
Data center in SharonvilleSharonvilleOperational4.2 MWest.
University of New Hampshire data center in DurhamUniversity of New HampshireDurhamOperational4.2 MWest.
Baltimore Technology ParkBaltimoreOperational4.1 MWest.
Data Center LenexaLenexaOperational4.1 MWest.
DC BLOX BHM1-ABirminghamOperational4.1 MWest.
Digital Realty Silicon Valley SJC30Digital RealtySanta ClaraOperational4.1 MWest.
365 Bridgewater NJBridgewaterOperational4 MWest.
Flexential - DEN5FlexentialCentennialOperational4 MWest.
Molina HealthcareMolina HealthcareAlbuquerqueOperational4 MWest.
Data center in AlbuquerqueAlbuquerqueOperational3.9 MWest.
Data center in Wichita FallsWichita FallsOperational3.9 MWest.
Equinix SV17EquinixSanta ClaraOperational3.9 MWest.
MicrosoftMicrosoftAtlantaOperational3.9 MWest.NVIDIA GPUs (some Microsoft Maia) (guess)
NCSA Petascale Computing FacilityNCSAChampaignOperational3.9 MWest.
Data center in Cimarron HillsCimarron HillsOperational3.8 MWest.
Centurylink data center in BurbankCenturylinkBurbankOperational3.7 MWest.
Dakota Carrier NetworkFargoOperational3.7 MWest.
Digital Realty Silicon Valley SJC16Digital RealtySanta ClaraOperational3.7 MWest.
Edgeconnex Data CenterEdgeConneXRancho CordovaOperational3.7 MWest.
Genome Data CenterWashington University in St. LouisSaint LouisOperational3.7 MWest.
Involta IndependenceIndependenceOperational3.6 MWest.
H5 Data Centers San AntonioH5 Data CentersSan AntonioOperational3.5 MWest.
Vantage VA15Vantage Data CentersSterlingOperational3.5 MWest.
Lumen Technologies data center in PhoenixLumen TechnologiesPhoenixOperational3.4 MWest.
TierPointFranklinOperational3.4 MWest.
Data center in Bound BrookBound BrookOperational3.3 MWest.
Data center in ManvilleManvilleOperational3.3 MWest.
Data center in Polk CityPolk CityOperational3.3 MWest.
Data center in WoodlawnWoodlawnOperational3.3 MWest.
Data Storage CentersPhoenixOperational3.3 MWest.
Evocative IAD1EvocativeRestonOperational3.3 MWest.
Skybox Houston OneSkyboxKatyOperational3.3 MWest.
AZ LabsQueen CreekOperational3.2 MWest.
Data center in CheyenneCheyenneOperational3.2 MWest.
Equinix DC14EquinixManassasOperational3.2 MWest.
Equinix SV8EquinixPalo AltoOperational3.2 MWest.
Flexential Tampa - NorthFlexentialTampaOperational3.2 MWest.
Lumen ClevelandClevelandOperational3.2 MWest.
Information Systems FacilityWSMRWhite SandsOperational3.1 MWest.
Manasquan Cable Landing Station (Apollo)VodafoneRamtownOperational3.1 MWest.
1623 FarnamNews-Press & GazetteOmahaOperational3 MWest.
Centersquare IAD3CentersquareDullesOperational3 MW
Compute NorthKearneyOperational3 MWest.
Data center in Kansas CityKansas CityOperational3 MWest.
Data center in QuincyQuincyOperational3 MWest.
Data center in South RidingSouth RidingOperational3 MWest.
Equinix SV6EquinixSunnyvaleOperational3 MWest.
Digital Fortress LynnwoodLynnwoodOperational2.9 MWest.
East Kentucky Network DatacenterIvelOperational2.9 MWest.
Old MainClarkson UniversityPotsdamOperational2.9 MWest.
SimpleHelixHuntsvilleOperational2.9 MWest.
Tennessee South Data CenterState of TennesseeSmyrnaOperational2.9 MWest.
US Signal - CO01US SignalEnglewoodOperational2.9 MWest.
Amazon IAD-606Amazon Web ServicesAshburnOperational2.8 MWest.AWS Trainium and NVIDIA GPUs (guess)
Csquare SFO4CsquareSanta ClaraOperational2.8 MWest.
Data center in AlpharettaAlpharettaOperational2.8 MWest.
Riot KentuckyMetropolisOperational2.8 MWest.
TierPointTulsaOperational2.8 MWest.
Verizon WirelessGoodlettsvilleOperational2.8 MWest.
Los Alamos NL VenadoUS Department of EnergyLos AlamosOperational2.8 MWNVIDIA A100, NVIDIA GH200
Ark Duluth Data CenterDuluthOperational2.7 MWest.
AureonDes MoinesOperational2.7 MWest.
CyrusOne data center in AustinCyrusOneAustinOperational2.7 MWest.
Data CenterOregon Health & Science UniversityRockcreekOperational2.7 MWest.
Data center in QuincyQuincyOperational2.7 MWest.
DataBank - DEN4DataBankWestminsterOperational2.7 MWest.
Expedient MilwaukeeFranklinOperational2.7 MWest.
QTS Data Center - Hillsboro 3Quality Technology ServicesHillsboroOperational2.7 MWest.
Santa Clara Data Center (SJC3)EvocativeSanta ClaraOperational2.7 MWest.
Verizon Wireless data center in New PalestineVerizon WirelessNew PalestineOperational2.7 MWest.
Flexential Salt Lake City - South ValleyFlexentialWest JordanOperational2.6 MWest.
George C. Wallace Alabama Supercomputer CenterAlabama Supercomputer AuthorityHuntsvilleOperational2.6 MWest.
Switch Edge 1EnterpriseOperational2.6 MWest.
TGN HillsboroTata CommunicationsHillsboroOperational2.6 MWest.
TierPoint data center in AllenTierPointAllenOperational2.6 MWest.
MIT LLSC TX-GAIAUS Department of DefenseHolyokeOperational2.6 MWNVIDIA V100
Lumen Santa ClaraLumen TechnologiesSanta ClaraOperational2.5 MWest.
Prime Santa ClaraPrimeSanta ClaraOperational2.5 MWest.
Siemens EDA - HDC / Data CenterSiemens Digital Industries SoftwareWilsonvilleOperational2.5 MWest.
Blockfusion data center in Niagara FallsBlockfusionNiagara FallsOperational2.4 MWest.
DirecTV data center in TucsonDirecTVTucsonOperational2.4 MWest.
Liberty Center OneRoyal OakOperational2.4 MWest.
Liquid WebWaverlyOperational2.4 MWest.
Switch Las Vegas 4SwitchLas VegasOperational2.4 MWest.
Data center in GilletteGilletteOperational2.3 MWest.
Data center in Pleasant HillPleasant HillOperational2.3 MWest.
Data center in YonkersYonkersOperational2.3 MWest.
Lumen Minneapolis 3Lumen TechnologiesMinneapolisOperational2.3 MWest.
PowerHouse CTP-02PowerHouseHopewellUnder construction2.3 MWest.
US Signal data center in RomulusUS SignalRomulusOperational2.3 MWest.
Verizon North Las VegasVerizonNorth Las VegasOperational2.3 MWest.
Condor Galaxy 1 (CG-1)G42,Cerebras SystemsSanta ClaraOperational2.2 MWest.Cerebras CS-2
LumenLumen TechnologiesSpokaneOperational2.2 MWest.
Lumen Dallas 6Lumen TechnologiesIrvingOperational2.2 MWest.
VerizonWinchesterOperational2.2 MWest.
Advanced Operations CenterUniversity of MinnesotaMinneapolisOperational2.1 MWest.
Xo Communications Colocation Data CenterSanta AnaOperational2.1 MWest.
Lawrence Livermore NL RZAdamsUS Department of EnergyLivermoreOperational2.1 MWNVIDIA V100, Cerebras CS-1, AMD Instinct MI300A
CenturyLinkAtlantaOperational2 MWest.
NetSource Communications, IncNetSourceNapervilleOperational2 MWest.
Northwest Data Center and Communications HubStanfordOperational2 MWest.
SU Green Data CenterSyracuse UniversityOnondagaOperational2 MWest.
Microsoft Explorer-WUS3MicrosoftPhoenixOperational2 MWAMD Radeon Instinct MI250X
Datacenter (386)UChicago ArgonneLemontOperational1.9 MWest.
StrongMindChandlerOperational1.9 MWest.
Sandia NL El DoradoUS Department of EnergyAlbuquerqueOperational1.9 MWAMD Instinct MI300A
Microsoft Azure Voyager-EUS2MicrosoftHendersonOperational1.8 MWNVIDIA A100
Blockfusion Niagra FallsNiagara FallsOperational1.8 MWest.
FirstLight data center in PortsmouthFirstLightPortsmouthOperational1.8 MWest.
Myndshift TechnologiesMesaOperational1.8 MWest.
amnet Data CenterStamfordOperational1.7 MWest.
AT&TPalmdaleOperational1.7 MWest.
DartPoints ColumbusDartPointsColumbusOperational1.7 MWest.
Data center in Santa ClaraSanta ClaraOperational1.7 MWest.
Omnis NetworkTempeOperational1.7 MWest.
Stream DFW IVStreamRichardsonOperational1.7 MWest.
VentureDataRexburgOperational1.7 MWest.
Data center in AcworthAcworthOperational1.6 MWest.
SEGRACharlotteOperational1.6 MWest.
1GServersPhoenixOperational1.5 MWest.
AT&T Tuckerton Cable Landing Station (TAT-14)AT&TTuckertonOperational1.5 MWest.
Choctaw Nation of Oklahoma Data CenterChoctaw Nation of oklahomaDurantOperational1.5 MWest.
DartPoints CharlestonDartPointsLadsonOperational1.5 MWest.
Data center in MiamiMiamiOperational1.5 MWest.
Turnkey InternetLathamOperational1.5 MWest.
Hut 8 H100 ClusterHut 8Chicago LoopOperational1.4 MWNVIDIA H100 SXM5 80GB
Amazon Web ServicesAmazon Web ServicesUmatillaOperational1.4 MWest.AWS Trainium and NVIDIA GPUs (guess)
Amazon Web ServicesAmazon Web ServicesBoardmanOperational1.4 MWest.AWS Trainium and NVIDIA GPUs (guess)
Data center in West ChicagoWest ChicagoOperational1.4 MWest.
DC Blox ChattanoogaChattanoogaOperational1.4 MWest.
Information Technology Data CenterPhillips Exeter AcademyExeterOperational1.4 MWest.
Manasquan Cable Landing Station (TAT-14)SprintManasquanOperational1.4 MWest.
NTT Silicon Valley data center campusNTT Global Data CentersSanta ClaraOperational1.4 MWest.
Amazon Web ServicesAmazon Web ServicesHermistonOperational1.3 MWest.AWS Trainium and NVIDIA GPUs (guess)
DartPoints SpartanburgDartPointsSpartanburgOperational1.3 MWest.
DataBank - DEN1DataBankCentennialOperational1.3 MWest.
Lumen San Antonio 2Lumen TechnologiesSan AntonioOperational1.3 MWest.
VerizonSandy CityOperational1.3 MWest.
Amazon Web ServicesAmazon Web ServicesBoardmanOperational1.2 MWest.AWS Trainium and NVIDIA GPUs (guess)
Crane DC - PortlandCrane Data CentersForest GroveOperational1.2 MWest.
Data center in East WenatcheeEast WenatcheeOperational1.2 MWest.
Data center in NashvilleNashvilleOperational1.2 MWest.
Flexential Salt Lake City - Fair ParkFlexentialSalt Lake CityOperational1.2 MWest.
Iron MountainIron MountainAirway HeightsOperational1.2 MWest.
MDCEl PasoOperational1.2 MWest.
Strata NetworksVernalOperational1.2 MWest.
TierPointLiberty LakeOperational1.2 MWest.
Microsoft Azure Pioneer-EUSMicrosoftLake MonticelloOperational1.1 MWNVIDIA A100
Microsoft Azure Pioneer-WUS2MicrosoftEast Wenatchee BenchOperational1.1 MWNVIDIA A100
iGLASS NetworksCaryOperational1.1 MWest.
University of Florida HiPerGator 3.0 SuperpodUniversity of FloridaGainesvilleOperational1 MWNVIDIA A100
CenturyLinkSunrise ManorOperational1 MWest.
Cloud Storage CorpHaysOperational1 MWest.
Data center in PecosPecosOperational1 MWest.
Data center in SturtevantSturtevantOperational1 MWest.
DatacenterCaribouOperational1 MWest.
E-FoamWinter GardenOperational1 MWest.
Marquette-Adams Telephone CoopPortageOperational1 MWest.
Vital RecordsHillsboroughOperational1 MWest.
RPI AiMOSRensselaer Polytechnic InstituteTroyOperational0.9 MWNVIDIA V100
AngelTrax Data CenterAngelTrax Mobile Video Surveillance SolutionsDothanOperational0.9 MWest.
Data center in MadisonMadisonOperational0.9 MWest.
Digital Realty ORD11Digital RealtyChicagoOperational0.9 MWest.
FiberState DatacenterDraperOperational0.9 MWest.
Fort Rock DCFort Rock Data CenterBendOperational0.9 MWest.
Newrays Two LLC MiningParisOperational0.9 MWest.
State of Montana Data CenterState of MontanaMiles CityOperational0.9 MWest.
AppleApplePrinevilleOperational0.8 MWest.
AT&T data center in KirksvilleAT&TKirksvilleOperational0.8 MWest.
Lumen Austin 3Lumen TechnologiesAustinOperational0.8 MWest.
Thin-nologyPflugervilleOperational0.8 MWest.
Recursion BioHive-2Recursion PharmaceuticalsSalt Lake CityOperational0.7 MWNVIDIA A100, NVIDIA H100 SXM5 80GB
Comcast data center in GreenwoodComcastGreenwoodOperational0.7 MWest.
CSSNW BellinghamCSS CommunicationsBellinghamOperational0.7 MWest.
Data center in TulsaTulsaOperational0.7 MWest.
Omaha SwitchCogent CommunicationsOmahaOperational0.7 MWest.
VerizonVerizonCentennialOperational0.7 MWest.
Princeton DellaPrinceton UniversityPrincetonOperational0.7 MWNVIDIA A100, NVIDIA H100 SXM5 80GB, NVIDIA A100 SXM4 80 GB
University of Illinois NCSA DeltaUniversity of Illinois Urbana-Champaign (UIUC)ChampaignOperational0.7 MWNVIDIA A100, NVIDIA A40 PCIe
DirecTV data center in BensonDirecTVBensonOperational0.6 MWest.
Family History CenterThe Church of Jesus Christ of Latter-day SaintsCondaOperational0.6 MWest.
Johns Hopkins Data CenterCantonOperational0.6 MWest.
Modesto Junior College West Data CenterYosemite Community College DistrictModestoOperational0.6 MWest.
TACC Lonestar6University of Texas at AustinJollyvilleOperational0.5 MWNVIDIA Quadro RTX 5000, NVIDIA V100, NVIDIA A100 PCIe
MIT SupercloudMassachusetts Institute of Technology (MIT)HolyokeOperational0.3 MWNVIDIA V100
Indiana University Bloomington Jetstream2Indiana University BloomingtonBloomingtonOperational0.3 MWNVIDIA A100, NVIDIA A100 SXM4 40 GB
U.S. Army JeanUS Department of DefenseAberdeenOperational0.2 MWNVIDIA A100
University of Minnesota AgateUniversity of MinnesotaMinneapolisOperational0.2 MWNVIDIA A100 SXM4 40 GB
Texas A&M GraceTexas A&MCollege StationOperational0.2 MWNVIDIA A100
Dell RattlerDell TechnologiesAustinOperational0.2 MWNVIDIA A100
123 Centralbigbyte.ccAlbuquerqueOperational
4421.io4421.ioEverettOperational
505 MarquetteAlbuquerqueOperational
Accelera Data SystemsDeer ValleyOperational
Agricultural and Biological EngineeringWest LafayetteOperational
AiNET One Market CenterAiNETBaltimoreOperational
Alembic Computer Services, Inc.Tempe JunctionOperational
All About Serving Process ServerChandlerOperational
Alliance TechnologyMesaOperational
Alpha FederalAlpha InnovationsSouth CharlestonOperational
Applied DigitalHarwoodOperationalNVIDIA GPUs (AMD possible) (guess)
Atlanta ATL13Digital RealtyAtlantaOperational
Atlantic.netAtlantic.netMaitlandOperational
Brandaleone Lab for Data and VisualizationDuke LibrariesDurhamOperational
Center for Computation & Technology (CCT)Baton RougeOperational
CenturyLinkLumen TechnologiesWinchesterOperational
CenturyLinkCameronOperational
Chick-fil-A Hiring CenterDennis SampierSterling HeightsOperational
ComarchMesaOperational
ComcastComcastSouthgateOperational
CoreSite Chicago Data Center (CH1)CoreSiteChicagoOperational
CoreSite DC1CoreSiteWashingtonOperational
Crown Castle BaltimoreCrown Castle FiberBaltimoreOperational
DartPoints AshevilleAshevilleOperational
DartPoints Baton Rouge 2DartPointsBaton RougeOperational
DartPoints CincinnatiDartPointsCincinnatiOperational
DartPoints ColumbiaDartPointsColumbiaOperational
DartPoints DublinDartPoints43017Operational
DartPoints GreenvilleDartPointsGreenvilleOperational
DartPoints ShreveportDartPointsShreveportOperational
DāStor: 3400 Horizon DriveKing of PrussiaOperational
Data center in AlbanyAlbanyOperational
Data center in AnacondaAnacondaOperational
Data center in BarabooBarabooOperational
Data center in ColumbusColumbusOperational
Data center in EdwardsvilleEdwardsvilleOperational
Data center in FranklinFranklinOperational
Data center in FranklinFranklinOperational
Data center in IndependenceIndependenceOperational
Data center in IndependenceIndependenceOperational
Data center in LambertvilleLambertvilleOperational
Data center in LenexaLenexaOperational
Data center in MorristownMorristownOperational
Data center in RedlandsRedlandsOperational
Data center in VistaVistaOperational
Data Holdings Data CenterMilwaukeeOperational
DataPro USA Web DevelopmentParadise ValleyOperational
DatavergeDatavergeBrooklynOperational
Date Center West - EugeneData Center WestMedfordOperational
Date Center West - EugeneData Center WestEugeneOperational
Digital Fortress - Portland 1Digital FortressPortlandOperational
Digital Fortress - Portland 2Digital FortressBeavertonOperational
Digital Realty New York JFK12Digital RealtyNew YorkOperational
Digital West Data CenterSan Luis ObispoOperational
e360ConcordOperational
EmailageChandlerOperational
Ergonomic GroupGlastonburyOperational
Expedient Owings MillsExpedientOwings MillsOperational
Expedient Pittsburgh Nova PlaceExpedientPittsburghOperational
Expedient TidepointExpedientBaltimoreOperational
Fermi MatadorAmarilloUnder construction
Fiberhub LAS1FiberhubLas VegasOperational
FirstLight Data CenterFirstLightPortlandOperational
Flexential - Denver - AuroraFlexentialAuroraOperational
Flexential CincinnatiFlexentialWest ChesterOperational
Flexential JacksonvilleFlexentialJacksonvilleOperational
Flexential Las Vegas - DowntownFlexentialLas VegasOperational
Flexential RaleighFlexentialMorrisvilleOperational
Flexential Salt Lake City - LindonFlexentialLindonOperational
Flexential Tampa - WestFlexentialTampaOperational
ForceAmp.comCoralvilleOperational
Forescout Technologies, Inc.San JoseOperational
Frontier (supercomputer)Oak Ridge National LaboratoryOak RidgeOperational
Frontier ScienceAmherstOperational
GlobeNet Tuckerton Cable Landing StationGlobeNetTuckertonOperational
Google FiberGoogleAtlantaOperationalGoogle TPU (plus NVIDIA GPUs for cloud customers) (guess)
GVTCGVTCTimberwood ParkOperational
H5 DC - PortlandH5 Data CentersPortlandOperational
H5 SecaucusH5SecaucusOperational
Iron City No. 1 Power Generator and Compute CenterKarthausOperational
Iron Mountain Data Centers AZS-1Paradise ValleyOperational
ITHome GardensOperational
J-Curve TechnologiesTempe JunctionOperational
Joliet Technology CenterJolietOperational
K-Motion InteractiveScottsdaleOperational
Landmax Data Systems, IncRushOperational
Learning GIS!West LafayetteOperational
LumenLumen TechnologiesSaint GeorgeOperational
Lumen Albany 4Lumen TechnologiesAlbanyOperational
Lumen Madison 1 Data CenterLumen TechnologiesMadisonOperational
Lumos NetworksLynchburgOperational
Meta Los Lunas Data CenterMetaLos LunasOperationalNVIDIA GPUs (some Meta MTIA) (guess)
Meta Richland Parish Data CenterMetaBastropUnder constructionNVIDIA GPUs (some Meta MTIA) (guess)
Microsoft Air Gapped SupercomputerMicrosoftNevadaOperationalNVIDIA GPUs (some Microsoft Maia) (guess)
Morgan WirelessBath (Berkeley Springs)Operational
NetralityNetralityChicagoOperational
Netrality Data CentersKansas CityOperational
NocRoom Miami IT ServicesCountry WalkOperational
NocRoom Miami IT ServicesFlagamiOperational
Norma Beach Cable Landing StationUnity Cable SystemLynnwoodOperational
Ntirety data center in San FranciscoNtiretySan FranciscoOperational
Open Computing FacilityBerkeleyOperational
Open Data Centers PiscatawayMiddlesexOperational
OptimumHQMesaOperational
Oso GrandeOso GrandeAlbuquerqueOperational
Parsec Data ManagementBillingsOperational
PetadataFremontOperational
Precision Prints Lufkin DatacenterLufkinOperational
Prime Santa ClaraPrimeSanta ClaraOperational
PTCStayton Cooperative TelephoneStaytonOperational
QES ComputersDublinOperational
Rack59 Data CenterOklahoma CItyOperational
RIC1 DC3Quality Technology ServicesSandstonOperational
San Jose Colocation CenterCoreSiteSan JoseOperational
SC data center in Medicine LodgeSCMedicine LodgeOperational
SDSU Computer RoomLa MesaOperational
Searcy Information TechnologiesCity of SearcySearcyOperational
Southwest CyberportAlbuquerqueOperational
The Putney School data center in BrattleboroThe Putney SchoolBrattleboroOperational
TierPoint MilwaukeeMilwaukeeOperational
TulsaConnectTulsaOperational
TulsaConnectTulsaOperational
TulsaConnect DC3Broken ArrowOperational
UNM Data CenterUNMAlbuquerqueOperational
UNMH data center in AlbuquerqueUNMHAlbuquerqueOperational
ValorC3ValorC3Saint GeorgeOperational
VaultLogixParadise ValleyOperational
VIRTBIZDallasOperational
Wave Broadband Tahoma Terra FacilityYelmOperational
West MonroeChicago LoopOperational
West Wisconsin Telcom data center in MenomonieWest Wisconsin TelcomMenomonieOperational
Windbreak CablePine BluffsOperational
Windstream CommunicationsDurhamOperational

Get in touch

Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.