Sungard Systems International is an operational data center in Bessemer, United States. Our footprint estimate of its power is about 10 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 10 MW (range 4.1 MW to 26 MW) Estimate from building footprint, low confidence. Footprint estimate: about 85,266 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 4,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 33.40478, -86.91157 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Sungard Systems International use?
We estimate the facility power at about 10 MW. Estimate from building footprint, low confidence.
Data centers near Bessemer
- DC BLOX BHM1 - DCBLOX Birmingham 13.5 km · 4.1 MW