Data Center Directory

TierPoint

TierPoint is an operational data center in Liberty Lake, United States. Our footprint estimate of its power is about 1.2 MW.

Key facts

StatusOperational
Facility power1.2 MW (range 0.6 MW to 2 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,040 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 510 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates47.67191, -117.09593

Satellite view

Questions

How much power does TierPoint use?

We estimate the facility power at about 1.2 MW. Estimate from building footprint, low confidence.

Data centers near Liberty Lake

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.