Johns Hopkins Data Center is an operational data center in Canton, United States. Our footprint estimate of its power is about 0.6 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 0.6 MW (range 0.3 MW to 0.9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 475 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 260 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 39.29356, -76.55173 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Johns Hopkins Data Center use?
We estimate the facility power at about 0.6 MW. Estimate from building footprint, low confidence.
Data centers near Canton
- Expedient Tidepoint 4.0 km
- Zayo Baltimore - 111 Market Pl 4.7 km
- Lumen Baltimore 5.9 km
- TierPoint Baltimore 6.7 km · 4.1 MW
- TierPoint Baltimore – BWI 14.2 km
- TierPoint Baltimore BWI 14.4 km · 7.4 MW
- Cogent Elkridge 17.1 km · 6.3 MW
- AiNET MD-790R 17.9 km · 11 MW