Lumen Austin 1 is an operational data center in Austin, United States. Our footprint estimate of its power is about 22 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 22 MW (range 11 MW to 35 MW) Estimate from building footprint, low confidence. Footprint estimate: about 18,274 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 9,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Smith School Road 4209 |
| Coordinates | 30.19650, -97.71240 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Lumen Austin 1 use?
We estimate the facility power at about 22 MW. Estimate from building footprint, low confidence.
Data centers near Austin
- Data Foundry Texas 1 298 m · 27 MW
- LightEdge Austin 2 (AUS2) 717 m · 18 MW
- CyrusOne Austin (Met 3) 1.6 km · 6 MW
- CyrusOne Austin (Met 2) 1.7 km · 2.7 MW
- LightEdge Austin 1 (AUS1) 2.0 km · 5.3 MW
- Cogent Austin 2.0 km
- Digital Realty AUS11 - Austin 2.4 km · 19 MW
- Data Foundry Austin 1 2.7 km · 9.1 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.