StrongMind is an operational data center in Chandler, United States. Our footprint estimate of its power is about 1.9 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 1.9 MW (range 1 MW to 3.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,612 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 810 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 33.34261, -111.84096 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does StrongMind use?
We estimate the facility power at about 1.9 MW. Estimate from building footprint, low confidence.
Data centers near Chandler
- US Signal AZ01 - Phoenix 1.9 km
- GoDaddy - Gilbert 2.2 km · 8.6 MW
- All About Serving Process Server 3.8 km
- Emailage 4.4 km
- Digital Realty Data Center 5.4 km · 12 MW
- Google Mesa 8.1 km · 237 MW
- H5 Data Centers Phoenix 8.4 km · 6.8 MW
- Digital Realty PHX15 (2121 S Price Rd) 8.7 km · 32 MW