University of New Hampshire data center in Durham is an operational data center operated by University of New Hampshire in Durham, United States. Our footprint estimate of its power is about 4.2 MW.

Key facts

StatusOperational
OperatorUniversity of New Hampshire
Facility power4.2 MW (range 2.1 MW to 6.8 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 3,533 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,800 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressLeavitt Lane 1, 03824
Coordinates43.14362, -70.95245

Satellite view

Questions

How much power does University of New Hampshire data center in Durham use?

We estimate the facility power at about 4.2 MW. Estimate from building footprint, low confidence.

Who operates University of New Hampshire data center in Durham?

University of New Hampshire.