Cipher Digital data center in Kermit is an operational data center operated by Cipher Digital in Kermit, United States. Our footprint estimate of its power is about 40 MW. Likely chips: NVIDIA GPUs (AMD possible) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Cipher Digital |
| Facility power | 40 MW (range 16 MW to 99 MW) Estimate from building footprint, low confidence. Footprint estimate: about 330,884 m² site outline x 0.12 kW per m² of land. |
| AI chips | NVIDIA GPUs (AMD possible) Guess from the operator, not confirmed. GPU cloud and AI hosting firms mostly deploy NVIDIA, a few deploy AMD. |
| GPU capacity if all AI | about 17,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Cipher Black Pearl Data Center |
| Coordinates | 31.68962, -103.06947 |
| Website | datacentermap.com/usa/texas/kermit/cipher-black-pearl |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Cipher Digital data center in Kermit use?
We estimate the facility power at about 40 MW. Estimate from building footprint, low confidence.
What chips does Cipher Digital data center in Kermit use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (AMD possible).
Who operates Cipher Digital data center in Kermit?
Cipher Digital.
Data centers near Kermit
- IONIC Digital Cedarvale 40.9 km · 38 MW
- Lonestar Dream -Tarbush Site 67.1 km · 28 MW
- Data center in Pecos 71.4 km · 1 MW
- Core Scientific Pecos TX Data Center 71.6 km · 30 MW
- Data center in Pecos 71.9 km · 4.9 MW
- Core Scientific COT2 Data Center 72.8 km · 18 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.