Data Center Directory

Switch Las Vegas 4

Switch Las Vegas 4 is an operational data center operated by Switch in Las Vegas, United States. Our footprint estimate of its power is about 2.4 MW.

Key facts

StatusOperational
OperatorSwitch
Facility power2.4 MW (range 1.2 MW to 3.9 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,011 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asSwitch Las Vegas 5
AddressEast Sahara Avenue 4495, 89104, Las Vegas
Coordinates36.14365, -115.07678

Satellite view

Questions

How much power does Switch Las Vegas 4 use?

We estimate the facility power at about 2.4 MW. Estimate from building footprint, low confidence.

Who operates Switch Las Vegas 4?

Switch.

Data centers near Las Vegas

More Switch data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.