Data Center Directory

Vantage VA13

Vantage VA13 is an operational data center operated by Vantage Data Centers in Sterling, United States. Our footprint estimate of its power is about 21 MW.

Key facts

StatusOperational
OperatorVantage Data Centers
Facility power21 MW (range 10 MW to 33 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 17,137 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 9,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asVantage VA14 · Vantage VA11 · Vantage VA12
AddressVantage Data Plaza 45070, 20166, Sterling
Coordinates39.00321, -77.44018

Satellite view

Questions

How much power does Vantage VA13 use?

We estimate the facility power at about 21 MW. Estimate from building footprint, low confidence.

Who operates Vantage VA13?

Vantage Data Centers.

Data centers near Sterling

More Vantage Data Centers data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.