Cologix ASH1

Cologix ASH1 is a data center under construction operated by Cologix in Ashburn, United States. Its power is about 156 MW.

Power demand is growing at this site

Key facts

StatusUnder construction
OperatorCologix
Facility power156 MW
Derived from a tagged IT power value. IT power tag in OpenStreetMap
IT power120 MW
GPU capacity if all AIabout 67,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asCologix ASH2
Address21673 Beaumeade Cir
Coordinates39.01913, -77.45774
Websitecologix.com

Satellite view

Questions

How much power does Cologix ASH1 use?

Public data puts the facility power at about 156 MW. Derived from a tagged IT power value.

Who operates Cologix ASH1?

Cologix.