Equinix DC21
Equinix DC21 is an operational data center operated by Equinix in Ashburn, United States. Our footprint estimate of its power is about 60 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 60 MW (range 30 MW to 96 MW) Estimate from building footprint, low confidence. Footprint estimate: about 16,734 m² building outline x 3 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 26,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Equinix DC22 |
| Address | Beaumeade Circle 22175, 20147, Ashburn |
| Opened | 2020 |
| Coordinates | 39.01181, -77.45451 |
| Website | equinix.com/data-centers/americas-colocation/united-states-colocation/washington-dc-data-centers/dc21 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix DC21 use?
We estimate the facility power at about 60 MW. Estimate from building footprint, low confidence.
Who operates Equinix DC21?
Equinix.
Data centers near Ashburn
- H5 Data Centers Ashburn 319 m · 55 MW
- Digital Realty IAD41 464 m · 91 MW
- Amazon IAD-169 590 m · 18 MW
- Equinix DC1-DC15,DC21-DC22 - Ashburn 639 m · 8 MW
- CloudHQ Ashburn Campus 654 m · 187 MW
- Digital Realty IAD42 808 m · 62 MW
- Equinix DC4 824 m · 8 MW
- Cologix ASH1 861 m · 156 MW
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.