Data Center Directory

Cortex supercomputer

Cortex supercomputer is an operational data center in Hornsby Bend, United States. Our footprint estimate of its power is about 58 MW.

Key facts

StatusOperational
Facility power58 MW (range 29 MW to 93 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 48,382 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 25,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates30.21562, -97.61894

Satellite view

Questions

How much power does Cortex supercomputer use?

We estimate the facility power at about 58 MW. Estimate from building footprint, low confidence.

Data centers near Hornsby Bend

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.