Cortex supercomputer
Cortex supercomputer is an operational data center in Hornsby Bend, United States. Our footprint estimate of its power is about 58 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 58 MW (range 29 MW to 93 MW) Estimate from building footprint, low confidence. Footprint estimate: about 48,382 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 25,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 30.21562, -97.61894 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Cortex supercomputer use?
We estimate the facility power at about 58 MW. Estimate from building footprint, low confidence.
Data centers near Hornsby Bend
- Tesla Cortex 787 m · 71 MW
- Data Foundry Austin 1 7.3 km · 9.1 MW
- Digital Realty AUS11 - Austin 7.4 km · 19 MW
- Cogent Austin 7.6 km
- CyrusOne Austin (Met 2) 7.7 km · 2.7 MW
- CyrusOne Austin (Met 3) 7.9 km · 6 MW
- LightEdge Austin 2 (AUS2) 8.6 km · 18 MW
- LightEdge Austin 1 (AUS1) 9.0 km · 5.3 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.