Apple - Maiden Data Center
Apple - Maiden Data Center is an operational data center in Newton, United States. Our footprint estimate of its power is about 87 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 87 MW (range 35 MW to 217 MW) Estimate from building footprint, low confidence. Footprint estimate: about 722,566 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 37,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 35.58876, -81.26231 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Apple - Maiden Data Center use?
We estimate the facility power at about 87 MW. Estimate from building footprint, low confidence.
Data centers near Newton
- Data center in Newton 264 m · 53 MW
- Data center in Newton 273 m · 58 MW
- T5@Charlotte 39.5 km · 5.8 MW
- Google Project Cardinal 42.4 km · 40 MW
- Google Lenoir Data Center 43.0 km · 17 MW
- 801 Main Street - Lenoir 44.9 km
- CLT2 52.8 km
- DC74-CLT1 52.9 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.