Anthropic Barber Lake

Anthropic Barber Lake is a data center under construction operated by Cipher Mining in Snyder, United States. No power figure is public for this site yet. Likely chips: TPU v7.

Power demand is growing at this site

Key facts

StatusUnder construction
OperatorCipher Mining
UsersAnthropic
Planned power300 MW by 2027-04-30
Epoch AI timeline projection.
AI chipsTPU v7
Reported (Epoch AI or owner data)
Coordinates32.39303, -100.86351 (city level)

Build timeline

DatePowerH100eWhat the satellite images and filings show
2025-09-1800Site grading and civil works begin.
2025-11-2900Foundations of Building 1 are visible.
2026-07-3000Building 1 shell is complete, with rooftop units installed, and most air-cooled chillers in place in a ground yard to the north. Most of the 120 backup diesel generators are also in place. Substantial progress since Nov 2025, still under construction and not yet energized.
2026-12-30 (projected)244 MW234,000Building 1 Phase I is operational: 168 MW critical IT power (244 MW gross), running Google TPU v7 (chip type inferred, tagged likely). We estimate ~Dec 2026, about 3 months later than the disclosed target, because the site is shell-complete but not yet energized as of the Jul 2026 image. Disclosed target: [Cipher 2025-09-25 PR](https://www.globenewswire.com/news-release/2025/09/25/3156107/0/en/Cipher-Mining-Signs-168-MW-10-Year-AI-Hosting-Agreement-with-Fluidstack.html) states the 168 MW critical IT load is "expected to be delivered by September 2026."
2027-04-30 (projected)300 MW289,000Building 1 Phase II is operational: 207 MW total critical IT (300 MW gross). Phase II adds 39 MW critical IT (see [Cipher 2025-11-20 PR](https://www.globenewswire.com/news-release/2025/11/20/3191801/0/en/Cipher-Mining-Signs-Additional-56-MW-10-Year-AI-Hosting-Agreement-with-Fluidstack.html)). We estimate ~Apr 2027, about 3 months later than the ~Q1 2027 target, based on construction progress.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2026-12-30TPU v7100,478Estimate
2027-04-30TPU v7123,804Estimate

Satellite view

Questions

What chips does Anthropic Barber Lake use?

Reported chips: TPU v7.

Who operates Anthropic Barber Lake?

Cipher Mining. Reported users: Anthropic.