Project Ginger East is an operational data center operated by Microsoft in West Des Moines, United States. Our footprint estimate of its power is about 67 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| Facility power | 67 MW (range 27 MW to 168 MW) Estimate from building footprint, low confidence. Footprint estimate: about 561,217 m² site outline x 0.12 kW per m² of land. |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 29,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Southeast Maffitt Lake Road 1475, West Des Moines |
| Coordinates | 41.51541, -93.71958 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Project Ginger East use?
We estimate the facility power at about 67 MW. Estimate from building footprint, low confidence.
What chips does Project Ginger East use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
Who operates Project Ginger East?
Microsoft.
Data centers near West Des Moines
- Project Alluvion 1.2 km · 56 MW
- Microsoft 1.5 km · 13 MW
- Microsoft Project Osmium 5.0 km · 228 MW
- Project Osmium 6.0 km · 75 MW
- Microsoft 6.1 km · 21 MW
- Aureon West Des Moines 9.2 km
- Project Mountain 9.3 km · 17 MW
- Aureon Downtown 10.9 km · 2.7 MW
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.