Project Ranier AWS Data Center
Project Ranier AWS Data Center is an operational data center in South Bend, United States. Our footprint estimate of its power is about 97 MW. Likely chips: AWS Trainium and NVIDIA GPUs (guess).
Key facts
| Status | Operational |
|---|---|
| Facility power | 97 MW (range 39 MW to 243 MW) Estimate from building footprint, low confidence. Footprint estimate: about 808,484 m² site outline x 0.12 kW per m² of land. |
| AI chips | AWS Trainium and NVIDIA GPUs Guess from the operator, not confirmed. AWS deploys its own Trainium chips next to NVIDIA GPUs. |
| GPU capacity if all AI | about 41,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Opened | October 2025 |
| Coordinates | 41.69023, -86.46869 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Project Ranier AWS Data Center use?
We estimate the facility power at about 97 MW. Estimate from building footprint, low confidence.
What chips does Project Ranier AWS Data Center use?
No chips are reported. Based on the operator, the likely chips are AWS Trainium and NVIDIA GPUs.
Data centers near South Bend
- Data center in South Bend 253 m · 19 MW
- Data center in South Bend 325 m · 19 MW
- Data center in South Bend 460 m · 19 MW
- Data center in South Bend 561 m · 19 MW
- Amazon AWS Data Center 2.5 km · 118 MW
- Anthropic-Amazon New Carlisle 3.8 km · 1.2 GW
- GAP Union Station 17.8 km
- Aunalytics South Bend Datacenter (AUSB) 17.8 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.