Switch Edge 1
Switch Edge 1 is an operational data center in Enterprise, United States. Our footprint estimate of its power is about 2.6 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 2.6 MW (range 1.3 MW to 4.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,152 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 36.05913, -115.21369 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Switch Edge 1 use?
We estimate the facility power at about 2.6 MW. Estimate from building footprint, low confidence.
Data centers near Enterprise
- Switch Las Vegas 8 153 m · 26 MW
- Switch12 292 m · 33 MW
- Switch Las Vegas 326 m · 29 MW
- Switch Las Vegas 12 328 m · 5.5 MW
- Switch Las Vegas 9 656 m · 29 MW
- Switch Las Vegas 15 860 m · 55 MW
- Switch Las Vegas 16 879 m · 6.9 MW
- Switch Las Vegas 10 930 m · 20 MW