Meta Montgomery
Meta Montgomery is an operational data center that is still expanding, operated by Meta in Montgomery, United States. Its power is about 199 MW, growing to about 465 MW by 2027-02. Epoch AI estimates about 175,000 H100-equivalent AI chips (B300).
Power demand is growing at this site
Key facts
| Status | Operational, expanding |
|---|---|
| Operator | Meta |
| Users | Meta |
| Facility power | 199 MW Reported (Epoch AI or owner data) |
| IT power | 153 MW |
| Planned power | 465 MW by 2027-02-23 Epoch AI timeline projection. |
| AI compute | 175,000 H100-equivalents → 407,000 planned |
| AI chips | B300 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 85,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 5.8 billion → 13.6 billion planned Epoch AI estimate, 2025 USD. |
| Builders | Hensel Phelps |
| Address | Co Rd 42, Montgomery, AL 36105, USA |
| Coordinates | 32.37771, -86.30908 (city level) |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2024-03-01 | 0 | 0 | Land clearing begins. |
| 2025-07-04 | 0 | 0 | Building 1 and 2 under construction, with all chillers visible. |
| 2026-03-20 | 0 | 0 | Buildings 1 and 2 are nearly complete, but there's still some equipment strewn around the site and few cars in the front carpark, so we expect 3 more months needed for commissioning and server installation. Building 3 has a half-finished roof and Building 4 shell is beginning construction. Buildings 5 and 6 are under construction. |
| 2026-06-18 | 199 MW | 175,000 | We estimate Buildings 1 and 2 are operational. |
| 2027-02-02 (projected) | 266 MW | 233,000 | Buildings 5 and 6 are operational (estimate). Based on the tent buildings at Meta Prometheus taking about 12 months from starting the tent structure to estimated operation. |
| 2027-02-23 (projected) | 465 MW | 407,000 | Buildings 3 and 4 are operational (estimate). In September 2025, Building 1 and 2 appeared to be in a similar state to Building 3 and 4 in May 2026. Based on that, we apply an 8-month delay to the Building 1 and 2 operational date to get the Building 3 and 4 operational date. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2026-06-18 | B300 | 69,074 | Estimate |
| 2027-02-02 | B300 | 92,209 | Estimate |
| 2027-02-23 | B300 | 161,283 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Meta Montgomery use?
Public data puts the facility power at about 199 MW, with about 465 MW planned by 2027. Reported (Epoch AI or owner data).
What chips does Meta Montgomery use?
Reported chips: B300.
Who operates Meta Montgomery?
Meta. Reported users: Meta.
Data centers near Montgomery
- Meta Montgomery Data Center 12.1 km · 245 MW
More Meta data centers
- Meta Hyperion United States
- QTS Cedar Rapids United States
- Meta Prometheus United States
- Meta Bowling Green United States
- QTS Eagle Mountain United States
- Meta Huntsville Data Center United States
- Altoona Meta Data Center United States
- Meta Kuna Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.