Meta Montgomery

Meta Montgomery is an operational data center that is still expanding, operated by Meta in Montgomery, United States. Its power is about 199 MW, growing to about 465 MW by 2027-02. Epoch AI estimates about 175,000 H100-equivalent AI chips (B300).

Power demand is growing at this site

Key facts

StatusOperational, expanding
OperatorMeta
UsersMeta
Facility power199 MW
Reported (Epoch AI or owner data)
IT power153 MW
Planned power465 MW by 2027-02-23
Epoch AI timeline projection.
AI compute175,000 H100-equivalents → 407,000 planned
AI chipsB300
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 85,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 5.8 billion → 13.6 billion planned
Epoch AI estimate, 2025 USD.
BuildersHensel Phelps
AddressCo Rd 42, Montgomery, AL 36105, USA
Coordinates32.37771, -86.30908 (city level)

Build timeline

DatePowerH100eWhat the satellite images and filings show
2024-03-0100Land clearing begins.
2025-07-0400Building 1 and 2 under construction, with all chillers visible.
2026-03-2000Buildings 1 and 2 are nearly complete, but there's still some equipment strewn around the site and few cars in the front carpark, so we expect 3 more months needed for commissioning and server installation. Building 3 has a half-finished roof and Building 4 shell is beginning construction. Buildings 5 and 6 are under construction.
2026-06-18199 MW175,000We estimate Buildings 1 and 2 are operational.
2027-02-02 (projected)266 MW233,000Buildings 5 and 6 are operational (estimate). Based on the tent buildings at Meta Prometheus taking about 12 months from starting the tent structure to estimated operation.
2027-02-23 (projected)465 MW407,000Buildings 3 and 4 are operational (estimate). In September 2025, Building 1 and 2 appeared to be in a similar state to Building 3 and 4 in May 2026. Based on that, we apply an 8-month delay to the Building 1 and 2 operational date to get the Building 3 and 4 operational date.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2026-06-18B30069,074Estimate
2027-02-02B30092,209Estimate
2027-02-23B300161,283Estimate

Satellite view

Questions

How much power does Meta Montgomery use?

Public data puts the facility power at about 199 MW, with about 465 MW planned by 2027. Reported (Epoch AI or owner data).

What chips does Meta Montgomery use?

Reported chips: B300.

Who operates Meta Montgomery?

Meta. Reported users: Meta.