Blockfusion data center in Niagara Falls
Blockfusion data center in Niagara Falls is an operational data center operated by Blockfusion in Niagara Falls, United States. Our footprint estimate of its power is about 2.4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Blockfusion |
| Facility power | 2.4 MW (range 1.2 MW to 3.8 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,986 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Frontier Avenue 1999, 14304, Niagara Falls |
| Opened | 2019 |
| Coordinates | 43.07483, -78.94481 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Blockfusion data center in Niagara Falls use?
We estimate the facility power at about 2.4 MW. Estimate from building footprint, low confidence.
Who operates Blockfusion data center in Niagara Falls?
Blockfusion.
Data centers near Niagara Falls
- Blockfusion Niagra Falls 4.8 km · 1.8 MW
- US Bitcoin data center in Niagara Falls 7.0 km · 13 MW
- Frontier Science 14.3 km
- I-Evolve Technology Datacenter Amherst 14.5 km
- Data center in Getzville 16.2 km · 5.3 MW
- H5 Data Centers Buffalo I 18.8 km
- H5 Data Centers Buffalo II 19.1 km
- 325 Delaware Ave 21.0 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.