Genome Data Center
Genome Data Center is an operational data center operated by Washington University in St. Louis in Saint Louis, United States. Our footprint estimate of its power is about 3.7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Washington University in St. Louis |
| Facility power | 3.7 MW (range 1.8 MW to 5.9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,083 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | South Newstead Avenue 222, 63110, Saint Louis |
| Coordinates | 38.63655, -90.25544 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Genome Data Center use?
We estimate the facility power at about 3.7 MW. Estimate from building footprint, low confidence.
Who operates Genome Data Center?
Washington University in St. Louis.
Data centers near Saint Louis
- TierPoint St. Louis - Locust 3.7 km
- Cogent St Louis 4.1 km
- Netrality St. Louis - 210 N Tucker 5.1 km · 19 MW
- TierPoint St. Louis - Olive 5.2 km · 13 MW
- 710 Tucker St Louis 5.2 km
- Netrality St. Louis - 900 Walnut 5.4 km
- TierPoint St. Louis – Millpark 15.2 km
- Data center in Edwardsville 32.9 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.