Colossus 1
Colossus 1 is an operational AI data center operated by SpaceXAI in Memphis, United States. Its power is about 425 MW. Epoch AI estimates about 276,000 H100-equivalent AI chips (H100, H200, B200).
Key facts
| Status | Operational |
|---|---|
| Operator | SpaceXAI |
| Users | Anthropic |
| Facility power | 425 MW Reported (Epoch AI or owner data) |
| IT power | 340 MW |
| AI compute | 276,000 H100-equivalents |
| AI chips | H100, H200, B200 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 190,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 12.9 billion Epoch AI estimate, 2025 USD. |
| Energy partners | MLGW |
| Address | 3231 Riverport Rd, Memphis, TN 38109 |
| Coordinates | 35.08285, -90.07638 |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2024-04-24 | 0 | 0 | Construction starts with a road added on site, retrofitting a former Electrolux building. |
| 2024-08-11 | 45 MW | 25,000 | First [significant/useful training workload](https://x.ai/colossus) on 25k H100s. |
| 2024-09-02 | 181 MW | 100,000 | [100k H100s online](https://archive.is/z39uN). |
| 2025-02-17 | 361 MW | 200,000 | 150k H100s and 50k H200s online. This is roughly when [Musk](https://archive.is/z39uN) [said](https://archive.is/z39uN), plus on this date they reported "running jobs with 150K+ GPUs". |
| 2025-03-06 | 361 MW | 0 | Second substation almost connected (red cables) |
| 2025-07-22 | 442 MW | 276,000 | 30k B200s [added](https://archive.is/oHQSA) (in GB200 configuration). |
| 2025-09-17 | 348 MW | 209,000 | Third substation looks completed, but it doesn't appear to be connected to the building yet. Some air-cooled chillers removed, while large cooling towers are added. |
| 2025-10-19 | 348 MW | 209,000 | There is still construction visible in the third substation yard and next to the new cooling towers. |
| 2025-11-07 | 442 MW | 276,000 | Third substation was expected to power the building in Fall. |
| 2026-02-11 | 425 MW | 276,000 | All air-cooled chillers have been disconnected and/or removed from the site, leaving only the cooling towers for cooling. The third substation looks complete, with red cables connected to the building. |
| 2026-05-06 | 425 MW | 276,000 | Anthropic [announces](https://www.anthropic.com/news/higher-limits-spacex) their agreement with SpaceX to use all of the compute capacity at Colossus 1. They state that this corresponds to more than 300 MW (presumably IT power) and over 220,000 GPUs. This is slightly different to previous reports adding up to 230,000 GPUs, but still roughly consistent with our estimates. |
| 2026-06-01 | 425 MW | 276,000 | We assume that Anthropic has started using Colossus 1 now, since the announcement said they would get access to 300 MW "within the month" of May. |
| 2026-06-15 | 425 MW | 276,000 | No major changes to the data center since February. Solar panels have been placed next to the facility. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2024-08-11 | H100 | 25,000 | Reported |
| 2024-09-02 | H100 | 100,000 | Reported |
| 2025-02-17 | H100 | 150,000 | Reported |
| 2025-02-17 | H200 | 50,000 | Reported |
| 2025-07-22 | B200 | 30,000 | Reported |
| 2026-06-01 | H200 | 50,000 | Reported |
| 2026-06-01 | B200 | 30,000 | Reported |
| 2026-06-01 | H100 | 150,000 | Reported |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Colossus 1 use?
Public data puts the facility power at about 425 MW. Reported (Epoch AI or owner data).
What chips does Colossus 1 use?
Reported chips: H100, H200, B200.
Who operates Colossus 1?
SpaceXAI. Reported users: Anthropic.
Data centers near Memphis
- xAI Colossus Memphis 4.1 km · 352 MW
- xAI Colossus 7.8 km · 126 MW
- Colossus 2 10.1 km · 48 MW
- Colossus 2 10.2 km · 1.3 GW
- MACROHARDRR 10.7 km · 16 MW
- Microhard 11.7 km · 20 MW
More SpaceXAI data centers
- Colossus 2 United States
- xAI QTS Atlanta United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.