Data Center Directory

Colossus 2

Colossus 2 is an operational data center that is still expanding, operated by SpaceXAI in Memphis, United States. Its power is about 1.3 GW, growing to about 2.1 GW by 2027-02. Epoch AI estimates about 1.1 million H100-equivalent AI chips (B200, B300).

Power demand is growing at this site

Key facts

StatusOperational, expanding
OperatorSpaceXAI
UsersAnthropic, Cursor, SpaceXAI
Facility power1.3 GW
Reported (Epoch AI or owner data)
IT power946 MW
Planned power2.1 GW by 2027-02-25
Epoch AI timeline projection.
AI compute1.1 million H100-equivalents → 1.8 million planned
AI chipsB200, B300
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 530,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 35.8 billion → 58.0 billion planned
Epoch AI estimate, 2025 USD.
Also known asxAI Macrohard Colossus 2
Address5420 Tulane Rd, Memphis, TN 38109
Coordinates34.99798, -90.03487

Build timeline

DatePowerH100eWhat the satellite images and filings show
2025-02-2800Land clearing begins next to the existing building.
2025-09-0800Battery facility connected to the building. 121 air-cooled chillers installed, which could support 200 MW. In the Duke faciltiy in nearby Mississippi, several natural gas turbines are in place but not fully connected up.
2025-10-19323 MW278,000Battery facility looks complete (though more might be added). Turbines look connected up, minimal construction around them. We believe this state corresponds to the first compute cluster brought online at this site of "approximately 110,000 GB200 processors, approximately 210 megawatts of compute power", as detailed in the [company S-1 filing, page 76](https://www.sec.gov/Archives/edgar/data/1181412/000162828026036936/spaceexplorationtechnologi.htm). Based on those numbers, we believe "compute power" corresponds to GPU server power. [Earlier](https://x.com/elonmusk/status/1947715674429919279) [tweets](https://x.com/elonmusk/status/1950251710141567110) from Elon Musk also support this timing, and it's consistent with the estimated cooling capacity based on the satellite image.
2026-01-13323 MW278,000Since October, an array of dry cooling air-cooled condensers has been added (the array of large fans to the left of the building), and appears almost complete. Two more similar arrays appear to be under construction. More air-cooled chillers, batteries, and gas turbines have also been installed.
2026-04-06661 MW556,000The first array of dry cooling air-cooled condensers for Building 1 has been completed and is operational. A second array, with larger fans, is about halfway complete (located to the south of the first array). More chillers have also been added. For Building 2, an array of dry cooling air-cooled condensers of the same type as Building 1's first array is beginning construction. We believe this corresponds to the "second cluster of 110,000 GB300 processors and 220 megawatts of compute power" from the [company S-1 filing, page 76](https://www.sec.gov/Archives/edgar/data/1181412/000162828026036936/spaceexplorationtechnologi.htm), with compute power corresponding to GPU server power. This is also consistent with our estimates based on cooling equipment.
2026-06-151.3 GW1.1 millionThe site is estimated to have at least ~830 MW of GPU server power, with at least "at least 220,000 additional GB300 processors and over 400 additional megawatts of compute power", corresponding to the "next phase of expansion" found in the following [company S-1 filing, page 76](https://www.sec.gov/Archives/edgar/data/1181412/000162828026036936/spaceexplorationtechnologi.htm). This estimate is backed up by our cooling and turbine based power production calculations. The cooling calculations suggest there is enough infrastructure to support ~850MW of IT Power. Similarly the energy production calculations support ~900MW of available IT Power. This gives us confidence that the proposed expansion was achieved in time. The roof for building 3 is halfway complete.
2027-02-25 (projected)2.1 GW1.8 millionBuilding 3 is estimated to be completed. The site is predicted to have enough power infrastructure installed for a total of 1.5 GW of IT Power. Based on building plans we predict the addition of three more cooling arrays similar to the 6x24 dry coolers near Building 1 and 2. With the completion of current cooling structures and the addition of these arrays there will be ~540MW more cooling capacity for a full facility total of ~1390MW. If this cooling capacity is supplemented by mobile coolers, there would be enough cooling and power infrastructure to support 1.5 GW of IT power.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2025-10-19B200110,000Reported
2026-04-06B300110,000Reported
2026-06-15B300330,000Reported
2027-02-25B300612,228Estimate

Satellite view

Questions

How much power does Colossus 2 use?

Public data puts the facility power at about 1.3 GW, with about 2.1 GW planned by 2027. Reported (Epoch AI or owner data).

What chips does Colossus 2 use?

Reported chips: B200, B300.

Who operates Colossus 2?

SpaceXAI. Reported users: Anthropic, Cursor, SpaceXAI.

Data centers near Memphis

More SpaceXAI data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.