QTS Cedar Rapids
QTS Cedar Rapids is a data center under construction operated by Meta in Fairfax, United States. No power figure is public for this site yet. Likely chips: B300.
Power demand is growing at this site
Key facts
| Status | Under construction |
|---|---|
| Operator | Meta |
| Users | Meta (speculative) |
| Planned power | 1.6 GW by 2027-11-15 Epoch AI timeline projection. |
| AI chips | B300 Reported (Epoch AI or owner data) |
| Energy partners | Alliant Energy |
| Address | 6200 76th Ave SW, Fairfax, IA 52228 |
| Coordinates | 41.90562, -91.75108 |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2025-01-17 | 0 | 0 | Land clearing begins for Building 1-3. |
| 2025-10-27 | 0 | 0 | Building 1 roof complete, with air-cooled chillers in place. Building 2 and 3 roofs are partly completed. Building 4 and 5 have a foundation. |
| 2026-04-16 | 0 | 0 | Based on satellite imagery, the Buildings 1-3 shells look complete. Buildings 4-6 are far along, with roofs largely in place, while the eastern Building 7 foundation is well underway. No buildings operational yet. |
| 2026-05-07 | 0 | 0 | Similar to April, Buildings 1-3 shells look complete. Buildings 4-6 are still far along, and the eastern Building 7 foundation is still underway. |
| 2026-10-23 | 0 | 0 | Buildings 1–3 look externally complete, with the air-cooled chillers fully installed, and surrounding yard work cleared. The many cars and trucks parked beside the buildings suggest commissioning is still underway, so we’re not counting any buildings operational yet. Buildings 4-6 shells appear complete, and Building 7 is nearly 90% roofed. This is based on high-resolution satellite imagery from this date. |
| 2026-12-31 (projected) | 627 MW | 510,000 | Buildings 1-3 are operational. Based on the visible progress in the October satellite image, and the expected completion date reported by [local news](https://corridorbusiness.com/scope-of-qts-data-project-in-cedar-rapids-continuing-to-grow/): “A QTS spokesperson said in July [2025] that the first phase of the project was expected to be completed in late 2026." |
| 2027-11-15 (projected) | 1.6 GW | 2.3 million | Buildings 4-7 are operational. Based on the expected completion date reported by [local news](https://corridorbusiness.com/scope-of-qts-data-project-in-cedar-rapids-continuing-to-grow/): “A QTS spokesperson said in July [2025] that [...] The second phase is expected to be completed in late 2027." |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2026-12-31 | B300 | 202,048 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
What chips does QTS Cedar Rapids use?
Reported chips: B300.
Who operates QTS Cedar Rapids?
Meta. Reported users: Meta.
Data centers near Fairfax
- Google Cedar Rapids 3.5 km
- ForceAmp.com 26.2 km
More Meta data centers
- Meta Hyperion United States
- Meta Prometheus United States
- Meta Bowling Green United States
- Meta Montgomery United States
- QTS Eagle Mountain United States
- Meta Huntsville Data Center United States
- Altoona Meta Data Center United States
- Meta Kuna Data Center United States