Anthropic Lake Mariner

Anthropic Lake Mariner is an operational data center that is still expanding, operated by AI XPV Platform in Barker, United States. Its power is about 245 MW, growing to about 441 MW by 2027-03. Epoch AI estimates about 293,000 H100-equivalent AI chips (TPU v7).

Power demand is growing at this site

Key facts

StatusOperational, expanding
OperatorAI XPV Platform
UsersAnthropic (likely)
Facility power245 MW
Reported (Epoch AI or owner data)
IT power210 MW
Planned power441 MW by 2027-03-31
Epoch AI timeline projection.
AI compute293,000 H100-equivalents → 527,000 planned
AI chipsTPU v7
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 120,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 8.0 billion → 14.3 billion planned
Epoch AI estimate, 2025 USD.
InvestorsGoogle, Blackstone
Address7725 Lake Rd, Barker, NY 14012
Coordinates43.35865, -78.60413

Build timeline

DatePowerH100eWhat the satellite images and filings show
2025-06-1100Land clearing begins for Building 1 (AKA CB3).
2026-03-0200Building 1 appears to have a complete shell and cooling equipment. Building 2 shell is still under construction, but 17 cooling units are already loaded on the roof. The outline of Building 3 is visible at the foundation.
2026-05-3149 MW59,000Building 1 is operational. On February 26, Terawulf [stated](https://investors.terawulf.com/news-events/press-releases/detail/132/terawulf-reports-fourth-quarter-and-full-year-2025-results) that CB3 was expected to be energized by mid-May 2026. A drone video commissioned from [RAAD](https://raad.com/) shows several cooling units operating on May 8. It's therefore likely that the building was fully operational around this date.
2026-07-2349 MW59,000Building 1 looks complete, consistent with it going operational back in May. Building 2 is mostly complete, with the row of backup generators on the east side of the building still being installed. Building 3 shell is complete, with rooftop coolers midway through installation, and no neighboring generators installed/visible yet.
2026-10-31245 MW293,000Building 2 (AKA CB4) is operational. On February 26, Terawulf [stated](https://investors.terawulf.com/news-events/press-releases/detail/132/terawulf-reports-fourth-quarter-and-full-year-2025-results) that CB4 was expected to be energized by Q3 2026.
2027-03-31 (projected)441 MW527,000Building 3 (AKA CB5) is operational. On February 26, 2026, Terawulf [stated](https://investors.terawulf.com/news-events/press-releases/detail/132/terawulf-reports-fourth-quarter-and-full-year-2025-results) that CB5 was expected to be energized by Q4 2026. However, based on the pace of Building 2, and comparisons to other projects like Stargate Abilene, we think this is optimistic. We expect a 3-month delay past the end of Q4 2026 to get to full operational capacity.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2026-05-31TPU v725,120Estimate
2026-10-31TPU v7125,598Estimate
2027-03-31TPU v7226,077Estimate

Satellite view

Questions

How much power does Anthropic Lake Mariner use?

Public data puts the facility power at about 245 MW, with about 441 MW planned by 2027. Reported (Epoch AI or owner data).

What chips does Anthropic Lake Mariner use?

Reported chips: TPU v7.

Who operates Anthropic Lake Mariner?

AI XPV Platform. Reported users: Anthropic.