Data center in Temple is an operational data center in Temple, United States. Our footprint estimate of its power is about 62 MW.

Key facts

StatusOperational
Facility power62 MW (range 31 MW to 100 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 51,859 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 26,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates31.13191, -97.37213

Satellite view

Questions

How much power does Data center in Temple use?

We estimate the facility power at about 62 MW. Estimate from building footprint, low confidence.

Data centers near Temple

Sources

Correct this page or get the data