Meta data center in Covington
Meta data center in Covington is an operational data center operated by Meta in Covington, United States. Our footprint estimate of its power is about 170 MW. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Meta |
| Facility power | 170 MW (range 85 MW to 272 MW) Estimate from building footprint, low confidence. Footprint estimate: about 141,596 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | NVIDIA GPUs (some Meta MTIA) Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference. |
| GPU capacity if all AI | about 73,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 33.60139, -83.70543 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Meta data center in Covington use?
We estimate the facility power at about 170 MW. Estimate from building footprint, low confidence.
What chips does Meta data center in Covington use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).
Who operates Meta data center in Covington?
Meta.
Data centers near Covington
- Meta Stanton Springs Data Center 480 m · 151 MW
- Meta data center in Covington 808 m · 194 MW
- Meta data center in Covington 1.0 km · 92 MW
- QTS Suwanee 58.4 km · 34 MW
- QTS Atlanta-Suwanee (SUW1) 58.4 km · 67 MW
- Serverfarm ATL1 Atlanta 58.6 km
- Flexential - Atlanta/Norcross (ATL1/2) 60.2 km · 4.9 MW
- DC BLOX ATL1 - DCBLOX Atlanta 64.0 km
More Meta data centers
- Meta Hyperion United States
- QTS Cedar Rapids United States
- Meta Prometheus United States
- Meta Bowling Green United States
- Meta Montgomery United States
- QTS Eagle Mountain United States
- Meta Huntsville Data Center United States
- Altoona Meta Data Center United States