AWS New Albany is an operational data center that is still expanding, operated by Amazon Web Services in New Albany, United States. Its power is about 255 MW, growing to about 405 MW by 2027-07. Epoch AI estimates about 201,000 H100-equivalent AI chips (Trainium2, H100, H200, B200).

Power demand is growing at this site

Key facts

StatusOperational, expanding
OperatorAmazon Web Services
Facility power255 MW
Reported (Epoch AI or owner data)
IT power213 MW
Planned power405 MW by 2027-07-01
Epoch AI timeline projection.
AI compute201,000 H100-equivalents → 352,000 planned
AI chipsTrainium2, H100, H200, B200
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 120,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 8.1 billion → 12.8 billion planned
Epoch AI estimate, 2025 USD.
Address13360 Miller Rd NW
Coordinates40.11581, -82.73954

Build timeline

DatePowerH100eWhat the satellite images and filings show
2022-06-0100Land clearing begins for Buildings 5-9 (eastern campus).
2024-12-01136 MW92,000Buildings 5-9 (eastern campus) operational. [New Albany’s Dec. 2024 report](https://newalbanyohio.org/wp-content/uploads/2025/01/CD-2024-12.pdf) lists AWS partial occupancy for 5 buildings at the eastern campus. Note that we're only including roughly 44% of all the New Albany campuses IT Power as being dedicated to leading AI chips, based on all the types of compute instances [listed](https://docs.aws.amazon.com/ec2/latest/instancetypes/ec2-instance-regions.html). The full IT power is much higher than 113 MW.
2026-03-12255 MW201,000Middle campus Buildings 10, 12, 13, and 14 appear complete/likely operational. Building 11 is still installing backup generators, so it is not counted as operational. Based on satellite imagery, northern campus Buildings 1-3 appear in late construction, with all roofs complete but nearby generator/cooling equipment still being installed for buildings 2-3. Building 4 is still early in construction. Eastern campus Buildings 5-9 appear complete and operational as expected. Note that we're only including roughly 44% of all the New Albany campuses IT Power as being dedicated to leading AI chips, based on all the types of compute instances [listed](https://docs.aws.amazon.com/ec2/latest/instancetypes/ec2-instance-regions.html).
2026-05-18255 MW201,000Satellite imagery shows Building 1 in the northern campus still appears structurally finished, with no visible change from the prior two months, but we're still not counting it operational due to visible construction work around the perimeter. Buildings 2-3 still have nearby generators/cooling equipment being installed, and Building 4 is only roughly 80% roofed. Eastern campus Buildings 5-9 remain operational. Middle campus Buildings 10, 12, 13, and 14 remain operational; Building 11 is still installing backup generators and is not counted.
2027-07-01 (projected)405 MW352,000Expected operational date for the remaining tracked buildings (11, and 1-4) across the three campuses. This estimate is based on the previous buildings taking roughly 1.5 years from steel framing to complete operational status. Note that we're only including roughly 44% of all the New Albany campuses IT Power as being dedicated to leading AI chips, based on all the types of compute instances [listed](https://docs.aws.amazon.com/ec2/latest/instancetypes/ec2-instance-regions.html).

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2024-12-01Trainium28,714Estimate
2024-12-01H10064,944Estimate
2024-12-01H20021,648Estimate
2026-03-12Trainium236,702Estimate
2026-03-12B20034,917Estimate
2026-03-12H20023,603Estimate
2026-05-18B20046,847Estimate
2027-07-01B20094,566Estimate

Satellite view

Questions

How much power does AWS New Albany use?

Public data puts the facility power at about 255 MW, with about 405 MW planned by 2027. Reported (Epoch AI or owner data).

What chips does AWS New Albany use?

Reported chips: Trainium2, H100, H200, B200.

Who operates AWS New Albany?

Amazon Web Services.

Data centers near New Albany

More Amazon Web Services data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.