Core42 Lake Mariner

Core42 Lake Mariner is an operational AI data center operated by Core42 in Barker, United States. Its power is about 58 MW. Epoch AI estimates about 72,000 H100-equivalent AI chips (B200).

Key facts

StatusOperational
OperatorCore42
UsersG42 (likely)
Facility power58 MW
Reported (Epoch AI or owner data)
IT power58 MW
AI compute72,000 H100-equivalents
AI chipsB200
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 32,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 2.2 billion
Epoch AI estimate, 2025 USD.
InvestorsGoogle
Address7725 Lake Rd, Barker, NY 14012
Coordinates43.35865, -78.60413

Build timeline

DatePowerH100eWhat the satellite images and filings show
2024-10-0100Land clearing begins for Building 1, also known as CB-1, the first large AI/HPC building on the site.
2025-10-0119 MW20,000Building 1 is operational. Based on Terawulf [saying](https://investors.terawulf.com/news-events/press-releases/detail/126/terawulf-reports-third-quarter-2025-results) "As of September 30, 2025, the site has energized 245 MW of Bitcoin-mining capacity and 22.5 MW of HPC capacity." The small "Wulf Den" building was [said](https://investors.terawulf.com/news-events/press-releases/detail/99/terawulf-to-deliver-over-70-mw-of-data-center) to be 2 MW of IT power while CB-1 would be 16 MW. This is roughly consistent with 22.5 MW of total facility power. This building is [leased](https://investors.terawulf.com/news-events/press-releases/detail/99/terawulf-to-deliver-over-70-mw-of-data-center) to Core42, a subsidiary of UAE-based G42. It likely uses NVIDIA DGX B200 servers.
2026-03-0219 MW20,000Buildings 1 and 2 both appear to have complete building and cooling equipment, based on satellite imagery. Not considering Building 2 operational yet, due to Terawulf's [statement](https://investors.terawulf.com/news-events/press-releases/detail/132/terawulf-reports-fourth-quarter-and-full-year-2025-results) that CB2B is expected in March 2026, and is likely still in commissioning phase.
2026-03-3158 MW72,000Building 2 is operational. On February 26, Terawulf [stated](https://investors.terawulf.com/news-events/press-releases/detail/132/terawulf-reports-fourth-quarter-and-full-year-2025-results) that CB2A is operational, presumably making up half the final capacity. CB2B was expected in March 2026. However, it's notable that a drone video commissioned from [RAAD](https://raad.com/) showed no cooling fan movement on May 8th, suggesting it was not in use. This building is [leased](https://investors.terawulf.com/news-events/press-releases/detail/99/terawulf-to-deliver-over-70-mw-of-data-center) to Core42, a subsidiary of UAE-based G42. It likely uses NVIDIA DGX B200 servers.
2026-07-2358 MW72,000Both buildings still operational according to satellite imagery.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2025-10-01B2007,852Estimate
2026-03-31B20028,463Estimate

Satellite view

Questions

How much power does Core42 Lake Mariner use?

Public data puts the facility power at about 58 MW. Reported (Epoch AI or owner data).

What chips does Core42 Lake Mariner use?

Reported chips: B200.

Who operates Core42 Lake Mariner?

Core42. Reported users: G42.

Data centers near Barker

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.