Alinged Data Center DFW-03

Alinged Data Center DFW-03 is an operational data center operated by Aligned Data Centers in Mansfield, United States. Our footprint estimate of its power is about 17 MW.

Key facts

StatusOperational
OperatorAligned Data Centers
Facility power17 MW (range 8.3 MW to 27 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 13,890 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 7,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressBritton Road 3801, 76063, Mansfield
Coordinates32.54982, -97.07486

Satellite view

Questions

How much power does Alinged Data Center DFW-03 use?

We estimate the facility power at about 17 MW. Estimate from building footprint, low confidence.

Who operates Alinged Data Center DFW-03?

Aligned Data Centers.

Data centers near Mansfield

More Aligned Data Centers data centers