Aligned Data Center - Chicago ORD-01
Aligned Data Center - Chicago ORD-01 is an operational data center operated by Aligned in Northlake, United States. Our footprint estimate of its power is about 18 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Aligned |
| Facility power | 18 MW (range 8.8 MW to 28 MW) Estimate from building footprint, low confidence. Footprint estimate: about 14,712 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 7,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Aligned Data Center - Chicago ORD-02 |
| Address | North Northwest Avenue 505, 60164, Northlake |
| Coordinates | 41.91400, -87.91752 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Aligned Data Center - Chicago ORD-01 use?
We estimate the facility power at about 18 MW. Estimate from building footprint, low confidence.
Who operates Aligned Data Center - Chicago ORD-01?
Aligned.
Data centers near Northlake
- Aligned Chicago (ORD-01) 119 m
- Ascent - CH2 803 m
- Microsoft - Azure Datacenter 997 m · 28 MW
- Data center in Northlake 2.2 km · 6.4 MW
- Digital Realty CHI (9333 Grand Ave) 5.0 km
- Digital Realty CHI (9377 Grand Ave) 5.1 km · 26 MW
- TierPoint Chicago - West 5.1 km
- CDC4 - 1808 Swift Dr 6.7 km
More Aligned data centers
- Aligned IAD-03 United States
- Aligned IAD-01 United States
- Aligned DFW-02 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.