EdgeConnex - DEN02
EdgeConnex - DEN02 is an operational data center operated by EdgeConneX in Dove Valley, United States. Our footprint estimate of its power is about 11 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | EdgeConneX |
| Facility power | 11 MW (range 5.3 MW to 17 MW) Estimate from building footprint, low confidence. Footprint estimate: about 8,872 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 39.56291, -104.82910 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does EdgeConnex - DEN02 use?
We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.
Who operates EdgeConnex - DEN02?
EdgeConneX.
Data centers near Dove Valley
- Centersquare Denver (DEN2) 267 m · 6.7 MW
- EdgeConneX Denver (EDCDEN01) 292 m
- US Signal CO01 - Denver 571 m · 2.9 MW
- Flexential - Denver/Englewood (DEN11) 920 m · 24 MW
- Equinix DE2 - Denver 2.5 km
- Xfinity/Comcast Data Center 2.8 km · 5.4 MW
- DataBank Denver (DEN1) 3.2 km · 1.3 MW
- DataBank Denver (DEN2) 3.5 km · 9.2 MW
More EdgeConneX data centers
- EdgeConneX PHX02 Data Center United States
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConnex DUB04 Ireland
- EdgeConneX Germany
- EdgeConneX Chicago (EDCCHI02) United States
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConneX data center in Lucan Ireland
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.