Switch Las Vegas 10 is an operational data center in Enterprise, United States. Our footprint estimate of its power is about 20 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 20 MW (range 9.9 MW to 32 MW) Estimate from building footprint, low confidence. Footprint estimate: about 16,557 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 8,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 36.05559, -115.22306 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Switch Las Vegas 10 use?
We estimate the facility power at about 20 MW. Estimate from building footprint, low confidence.
Data centers near Enterprise
- Switch Las Vegas 9 309 m · 29 MW
- Switch Las Vegas 8 830 m · 26 MW
- Switch Edge 1 930 m · 2.6 MW
- Switch Las Vegas 15 954 m · 55 MW
- Switch12 1.1 km · 33 MW
- Switch Las Vegas 12 1.2 km · 5.5 MW
- Switch Las Vegas 16 1.2 km · 6.9 MW
- Switch Las Vegas 1.3 km · 29 MW