U.S. Bank National Data Process Center
U.S. Bank National Data Process Center is an operational data center in Olathe, United States. Our footprint estimate of its power is about 26 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 26 MW (range 13 MW to 42 MW) Estimate from building footprint, low confidence. Footprint estimate: about 21,791 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 11,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | West Valley Parkway 24101, 66061, Olathe |
| Coordinates | 38.93559, -94.86450 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does U.S. Bank National Data Process Center use?
We estimate the facility power at about 26 MW. Estimate from building footprint, low confidence.
Data centers near Olathe
- Data center in Olathe 549 m · 14 MW
- LightEdge Kansas City Cavern (KCI2) 6.7 km
- DataBank Kansas City (MCI3) 8.2 km · 4.1 MW
- Data center in Lenexa 8.4 km
- TierPoint Kansas City - Lenexa 9.5 km · 5.5 MW
- WANSEC DC16 13.3 km
- DataBank Kansas City (MCI2) 14.2 km
- Netrality Kansas City Metro – KC2 | 7801 Nieman 14.3 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.