Data center in Cimarron Hills
Data center in Cimarron Hills is an operational data center in Cimarron Hills, United States. Our footprint estimate of its power is about 3.8 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 3.8 MW (range 1.9 MW to 6.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,169 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Irwin Avenue 600 |
| Coordinates | 38.80267, -104.52198 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Cimarron Hills use?
We estimate the facility power at about 3.8 MW. Estimate from building footprint, low confidence.
Data centers near Cimarron Hills
- T5@Colorado Springs 23.2 km · 11 MW
- Data102 - COS01 26.4 km
- Walmart Colorado Data Center 30.7 km · 35 MW
- SAP COS02 30.9 km · 8.1 MW
Sources
Correct this page or get the data