Data center in Bound Brook is an operational data center in Bound Brook, United States. Our footprint estimate of its power is about 3.3 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 3.3 MW (range 1.3 MW to 8.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 27,802 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Rackspace Somerset NYC1 |
| Coordinates | 40.54333, -74.53837 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Bound Brook use?
We estimate the facility power at about 3.3 MW. Estimate from building footprint, low confidence.
Data centers near Bound Brook
- Rackspace Belmont NYC2 287 m · 7.6 MW
- Data center in Somerset 501 m · 32 MW
- CyrusOne NJ-1 860 m · 40 MW
- BNY Mellon Somerset 1.5 km · 13 MW
- Digital Realty data center in Manville 1.6 km · 11 MW
- Data center in Manville 2.3 km · 3.3 MW
- Digital Fortress (PNJ) 3.5 km · 18 MW
- Equinix 3.6 km · 10 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.