Data Center Directory

Google Omaha

Google Omaha is an operational data center that is still expanding, operated by Google in Omaha, United States. Its power is about 284 MW, growing to about 474 MW by 2028-07. Epoch AI estimates about 199,000 H100-equivalent AI chips (TPU v5e, TPU v5p, TPU v6e, TPU v7).

Power demand is growing at this site

Key facts

StatusOperational, expanding
OperatorGoogle
UsersGoogle DeepMind (speculative)
Facility power284 MW
Reported (Epoch AI or owner data)
IT power237 MW
Planned power474 MW by 2028-07-23
Epoch AI timeline projection.
AI compute199,000 H100-equivalents → 904,000 planned
AI chipsTPU v5e, TPU v5p, TPU v6e, TPU v7
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 130,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 9.0 billion → 15.0 billion planned
Epoch AI estimate, 2025 USD.
Address11110 State St, Omaha, NE 68142
Coordinates41.33568, -96.05236

Build timeline

DatePowerH100eWhat the satellite images and filings show
2021-11-2500Land clearing begins.
2024-04-0895 MW40,000Building 1 operational, based on it being 6 months after roof was complete, infrastructure looked complete for 5 months.
2024-07-2995 MW40,000Building 2 has 3 cooling towers installed.
2024-11-19189 MW88,000Building 2 is operational, based on it being 8 months since the roof was complete, and surrounding infrastructure looks just completed (finishing the cooling towers).
2025-03-16189 MW88,000Confirmation that there's no obvious construction happening for Building 2. Building 3 roof started.
2025-04-21189 MW88,000Confident that Building 2 is operational
2025-10-21189 MW88,000Building 3 has all backup generators in place but they are still being installed. Two cooling towers have fans on them, with more underway. To the south of Building 3, more land has been cleared and there's a new carpark. This suggests another building will soon start construction.
2026-05-15189 MW88,000Building 3 appears almost complete, with only minimal construction work and equipment remaining. The cooling towers are spaced apart in an unusual way, but there's no obvious sign that more will be installed before operation. Buildings 4 and 5 haven't started construction yet, the cleared land is still empty.
2026-06-30284 MW199,000Building 3 is operational (estimate). Based on there being minimal construction work as of May 15.
2028-01-23 (projected)379 MW503,000Building 4 is operational. Expect a 4th building because there's enough land cleared for it. Assuming the foundation starts at the end of May 2026 and it takes a similar time to Building 3 from foundation to operational (1 year 8 months).
2028-07-23 (projected)474 MW904,000Building 5 is operational. We expect a 5th building because there's enough land cleared for one. We assume a roughly 6-month delay after Building 4.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2024-04-08TPU v5e179,798Estimate
2024-04-08TPU v5p9,028Estimate
2024-11-19TPU v5e263,957Estimate
2024-11-19TPU v5p47,061Estimate
2024-11-19TPU v6e15,411Estimate
2026-06-30TPU v6e28,846Estimate
2026-06-30TPU v741,901Estimate

Satellite view

Questions

How much power does Google Omaha use?

Public data puts the facility power at about 284 MW, with about 474 MW planned by 2028. Reported (Epoch AI or owner data).

What chips does Google Omaha use?

Reported chips: TPU v5e, TPU v5p, TPU v6e, TPU v7.

Who operates Google Omaha?

Google. Reported users: Google DeepMind.

Data centers near Omaha

More Google data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.