Data center in Somerset
Data center in Somerset is an operational data center in Somerset, United States. Our footprint estimate of its power is about 32 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 32 MW (range 16 MW to 51 MW) Estimate from building footprint, low confidence. Footprint estimate: about 26,520 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 14,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Howard Avenue 665, 08873, Somerset |
| Coordinates | 40.53987, -74.54217 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Somerset use?
We estimate the facility power at about 32 MW. Estimate from building footprint, low confidence.
Data centers near Somerset
- CyrusOne NJ-1 373 m · 40 MW
- Rackspace Belmont NYC2 410 m · 7.6 MW
- Data center in Bound Brook 501 m · 3.3 MW
- BNY Mellon Somerset 1.1 km · 13 MW
- Digital Realty data center in Manville 1.2 km · 11 MW
- Data center in Manville 1.8 km · 3.3 MW
- Digital Fortress (PNJ) 3.9 km · 18 MW
- Equinix 4.0 km · 10 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.