Cherokee Data Center is an operational data center in Tulsa, United States. Our footprint estimate of its power is about 45 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 45 MW (range 22 MW to 72 MW) Estimate from building footprint, low confidence. Footprint estimate: about 37,493 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 19,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | North Lakewood Avenue 7400, 74073, Tulsa |
| Coordinates | 36.26255, -95.91004 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Cherokee Data Center use?
We estimate the facility power at about 45 MW. Estimate from building footprint, low confidence.
Data centers near Tulsa
- OneNet OSU Tulsa 13.0 km
- TierPoint Tulsa-Archer 13.5 km · 2.8 MW
- Lumen Tulsa 1 13.9 km
- Jackson Technical Datacenter 14.0 km
- 321 S Boston Ave 14.1 km
- TulsaConnect 14.6 km
- TulsaConnect DC3 19.2 km
- TulsaConnect DC3 19.3 km