Facebook Altoona Data Center 3 is an operational data center operated by Meta in Altoona, United States. Our footprint estimate of its power is about 109 MW. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).

Key facts

StatusOperational
OperatorMeta
Facility power109 MW (range 54 MW to 174 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 90,679 m² building outline x 1 floor(s) x 1.2 kW/m².
AI chipsNVIDIA GPUs (some Meta MTIA)
Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference.
GPU capacity if all AIabout 47,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asFacebook Altoona Data Center 2
Coordinates41.66705, -93.50656

Satellite view

Questions

How much power does Facebook Altoona Data Center 3 use?

We estimate the facility power at about 109 MW. Estimate from building footprint, low confidence.

What chips does Facebook Altoona Data Center 3 use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).

Who operates Facebook Altoona Data Center 3?

Meta.