MineOne Wyoming Data Center
MineOne Wyoming Data Center is an operational data center operated by MineOne in Cheyenne, United States. Our footprint estimate of its power is about 4.6 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | MineOne |
| Facility power | 4.6 MW (range 1.8 MW to 11 MW) Estimate from building footprint, low confidence. Footprint estimate: about 38,007 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 2,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 41.12499, -104.89485 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does MineOne Wyoming Data Center use?
We estimate the facility power at about 4.6 MW. Estimate from building footprint, low confidence.
Who operates MineOne Wyoming Data Center?
MineOne.
Data centers near Cheyenne
- Microsoft data center in Cheyenne 273 m · 5.3 MW
- Data center in Cheyenne 385 m · 5.8 MW
- Data center in Cheyenne 423 m · 3.2 MW
- University Corporation for Atmospheric Research data center in Cheyenne 432 m · 6.4 MW
- Data center in Cheyenne 604 m · 14 MW
- Microsoft CYS Datacenter 774 m · 131 MW
- ACT Cheyenne 840 m
- Data center in Cheyenne 1.2 km · 19 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.