STACK NVA02E
STACK NVA02E is an operational data center operated by STACK Infrastructure in Manassas, United States. Our footprint estimate of its power is about 51 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | STACK Infrastructure |
| Facility power | 51 MW (range 25 MW to 81 MW) Estimate from building footprint, low confidence. Footprint estimate: about 21,123 m² building outline x 2 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 22,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | STACK NVA02x |
| Address | Hornbaker Road 9570, 20109, Manassas |
| Coordinates | 38.74548, -77.53829 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does STACK NVA02E use?
We estimate the facility power at about 51 MW. Estimate from building footprint, low confidence.
Who operates STACK NVA02E?
STACK Infrastructure.
Data centers near Manassas
- STACK Infrastructure NVA02 158 m · 118 MW
- STACK NVA02x 300 m · 47 MW
- STACK NVA02A 505 m · 21 MW
- EvoSwitch WDC1 610 m · 19 MW
- Amazon IAD-132 688 m · 26 MW
- Amazon IAD-105 1.6 km · 62 MW
- Data center in Linton Hall 1.8 km · 17 MW
- Google Bristow 1.8 km · 286 MW
More STACK Infrastructure data centers
- STACK Infrastructure NVA02 United States
- STACK NVA05B United States
- STACK NVA06 United States
- STACK NVA02x United States
- STACK NVA05A United States
- Stack Infrastructure Portland PORO2 United States
- STACK NVA01A United States
- STACK NVA02A United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.