Microsoft EAT04
Microsoft EAT04 is a data center under construction operated by Microsoft in East Wenatchee Bench, United States. Our footprint estimate of its power is about 21 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Under construction |
|---|---|
| Operator | Microsoft |
| Facility power | 21 MW (range 11 MW to 34 MW) Estimate from building footprint, low confidence. Footprint estimate: about 17,667 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 9,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 47.41964, -120.21381 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft EAT04 use?
We estimate the facility power at about 21 MW. Estimate from building footprint, low confidence.
What chips does Microsoft EAT04 use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
Who operates Microsoft EAT04?
Microsoft.
Data centers near East Wenatchee Bench
- Microsoft EAT02 554 m · 22 MW
- Actapio 1.3 km · 6.9 MW
- Intergate Columbia 2.1 km · 31 MW
- Intergate Columbia B 2.4 km · 17 MW
- Data center in East Wenatchee 3.1 km · 1.2 MW
- Data center in Quincy 31.4 km · 19 MW
- Microsoft 31.7 km · 13 MW
- Azure OpenAI GPT-3 Cluster 32.0 km · 6.6 MW
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States