Google Council Bluffs (East)

Google Council Bluffs (East) is an operational AI data center operated by Google in Council Bluffs, United States. Its power is about 284 MW. Epoch AI estimates about 256,000 H100-equivalent AI chips (TPU v5e, TPU v6e, TPU v5p, TPU v7).

Key facts

StatusOperational
OperatorGoogle
UsersGoogle DeepMind (speculative)
Facility power284 MW
Reported (Epoch AI or owner data)
IT power237 MW
AI compute256,000 H100-equivalents
AI chipsTPU v5e, TPU v6e, TPU v5p, TPU v7
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 130,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 9.0 billion
Epoch AI estimate, 2025 USD.
Address10410 Bunge Ave, Council Bluffs, IA 51503
Coordinates41.16665, -95.79774

Build timeline

DatePowerH100eWhat the satellite images and filings show
2022-09-0600Land clearing begins for east buildings
2024-11-1995 MW49,000Building 1 is operational. Google Earth shows Building 1 had all backup generators and cooling towers installed by the end of August, but construction work was ongoing and there were almost no cars parked. By February 2025, Google Earth shows no construction work and many cars. So our best guess is in the middle, in November 2024. Building 3 roof is complete.
2025-06-15190 MW146,000Building 2 is operational. Assuming it takes 3 months after generators and cooling towers are finished, similar to Building 1.
2025-07-19190 MW146,000Land clearing begins in the southwest, suggesting more buildings are planned.
2026-01-11190 MW146,000Building 3 has all 34 backup generators installed and 4 cooling towers installed, with 3 more cooling towers under construction. There are gaps between cooling towers suggesting that more could be added. Buildings 1 and 2 are running close to full capacity, given that water vapor is coming out of 5 of 7 cooling towers for each building. The land cleared in the southwest appears to be shaped for two more similar buildings, with notches for substations.
2026-07-07284 MW256,000Building 3 is operational. 7 cooling towers were finally installed despite being more spread out compared to the first two buildings. Cooling towers models vary slightly between buildings. Ground clearing to the southwest seems to be setting up for two more buildings.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2024-11-19TPU v5e84,203Estimate
2024-11-19TPU v6e15,419Estimate
2024-11-19TPU v5p38,053Estimate
2025-06-15TPU v6e111,739Estimate
2025-06-15TPU v5p54,261Estimate
2026-07-07TPU v741,923Estimate
2026-07-07TPU v6e125,181Estimate

Satellite view

Questions

How much power does Google Council Bluffs (East) use?

Public data puts the facility power at about 284 MW. Reported (Epoch AI or owner data).

What chips does Google Council Bluffs (East) use?

Reported chips: TPU v5e, TPU v6e, TPU v5p, TPU v7.

Who operates Google Council Bluffs (East)?

Google. Reported users: Google DeepMind.