Liberty Center One is an operational data center operated by Liberty Center One in Royal Oak, United States. Our footprint estimate of its power is about 2.4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Liberty Center One |
| Facility power | 2.4 MW (range 1.2 MW to 3.8 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,991 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 5 networks PeeringDB. |
| Address | 4815 Delemere Ave |
| Coordinates | 42.53351, -83.17739 |
| Website | libertycenterone.com |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Liberty Center One use?
We estimate the facility power at about 2.4 MW. Estimate from building footprint, low confidence.
Who operates Liberty Center One?
Liberty Center One.
Data centers near Royal Oak
- ManagedWay TYM1 6.4 km
- ManagedWay TYM2 6.5 km
- 123.NET - DC1 - 24700 Northwestern Hwy. 8.5 km
- ManagedWay SFJ2 8.8 km
- 365 Data Centers Detroit (DT1) 9.8 km
- EdgeConneX Detroit (EDCDET01) 11.7 km · 6.5 MW
- Chick-fil-A Hiring Center 18.7 km
- Tesla 10k H100 Cluster 21.1 km · 15 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.