Microsoft Leesburg Building 1 is an operational data center operated by Microsoft in Leesburg, United States. Our footprint estimate of its power is about 31 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| Facility power | 31 MW (range 15 MW to 50 MW) Estimate from building footprint, low confidence. Footprint estimate: about 25,812 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 13,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Microsoft Leesburg Building 2 |
| Address | Compass Creek Parkway 19515, 20175, Leesburg |
| Coordinates | 39.07479, -77.56413 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft Leesburg Building 1 use?
We estimate the facility power at about 31 MW. Estimate from building footprint, low confidence.
What chips does Microsoft Leesburg Building 1 use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
Who operates Microsoft Leesburg Building 1?
Microsoft.
Data centers near Leesburg
- Microsoft Leesburg Building 4 700 m · 26 MW
- STACK NVA06 828 m · 62 MW
- Microsoft Leesburg Building 5 1.1 km · 15 MW
- Amazon IAD-668 2.5 km · 29 MW
- Stonewall Creek Business Park 3.4 km · 15 MW
- Google Leesburg Building 3 3.7 km · 33 MW
- 42254 THUNDERBALL DR 4.0 km · 34 MW
- True North Data Centers 4.2 km · 81 MW
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.