Data center in Ballenger Creek

Data center in Ballenger Creek is an operational data center in Ballenger Creek, United States. Our footprint estimate of its power is about 11 MW.

Key facts

StatusOperational
Facility power11 MW (range 5.3 MW to 17 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 8,758 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 4,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates39.37778, -77.41154

Satellite view

Questions

How much power does Data center in Ballenger Creek use?

We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.