Data Center Directory

First National Technical Center

First National Technical Center is an operational data center operated by First National of Nebraska in Omaha, United States. Our footprint estimate of its power is about 7.2 MW.

Key facts

StatusOperational
OperatorFirst National of Nebraska
Facility power7.2 MW (range 3.6 MW to 12 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 6,017 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 3,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates41.26142, -95.93650
Websitefnts.com

Satellite view

Questions

How much power does First National Technical Center use?

We estimate the facility power at about 7.2 MW. Estimate from building footprint, low confidence.

Who operates First National Technical Center?

First National of Nebraska.

Data centers near Omaha

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.