Meta El Paso Data Center
Meta El Paso Data Center is a data center under construction in Chaparral, United States. Our footprint estimate of its power is about 300 MW. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).
Power demand is growing at this site
Key facts
| Status | Under construction |
|---|---|
| Facility power | 300 MW (range 120 MW to 749 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,496,460 m² site outline x 0.12 kW per m² of land. |
| AI chips | NVIDIA GPUs (some Meta MTIA) Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference. |
| GPU capacity if all AI | about 130,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 31.99403, -106.36305 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Meta El Paso Data Center use?
We estimate the facility power at about 300 MW. Estimate from building footprint, low confidence.
What chips does Meta El Paso Data Center use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).
Data centers near Chaparral
- MDC 27.6 km · 1.2 MW
- OpenAI Stargate New Mexico 33.5 km
- Project Jupiter 34.6 km · 272 MW
- Information Systems Facility 44.4 km · 3.1 MW
- CenturyLink data center in Las Cruces 49.2 km · 4.5 MW