Data Center Directory

Crusoe Abilene Expansion

Crusoe Abilene Expansion is a data center under construction operated by Microsoft in Abilene, United States. No power figure is public for this site yet. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).

Power demand is growing at this site

Key facts

StatusUnder construction
OperatorMicrosoft
UsersMicrosoft (likely)
Planned power941 MW by 2027-11-11
Epoch AI timeline projection.
AI chipsNVIDIA GPUs (some Microsoft Maia)
Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips.
InvestorsNVIDIA
Address5502 Spinks Rd, Abilene, TX 79601
Coordinates32.49423, -99.80091

Build timeline

DatePowerH100eWhat the satellite images and filings show
2025-11-0200Land clearing begins for Buildings 1-2.
2026-01-1500Land clearing continues.
2027-09-17 (projected)470 MW854,000Building 1 operational. Based on the completion date to "build-out an office and data hall", stated in a [regulatory filing](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026008308).
2027-11-11 (projected)941 MW1.7 millionBuilding 2 operational. Based on the completion date to "build-out an office and data hall", stated in a [regulatory filing](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026008308).

Source: Epoch AI Frontier Data Centers.

Satellite view

Questions

What chips does Crusoe Abilene Expansion use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).

Who operates Crusoe Abilene Expansion?

Microsoft. Reported users: Microsoft.